My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCADIS U.S., INC. (3)
Clerk
>
Contracts / Agreements
>
A
>
ARCADIS U.S., INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 2:53:05 PM
Creation date
10/3/2025 2:51:07 PM
Metadata
Fields
Template:
Contracts
Company Name
ARCADIS U.S., INC.
Contract #
A-2025-152
Agency
Public Works
Council Approval Date
9/16/2025
Expiration Date
9/15/2028
Insurance Exp Date
6/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> CITY OF SANTA ANA <br /> 3. Upon completion of construction and acceptance by owning Agency, consultant <br /> shall schedule a field visit to document final improvements and photograph final <br /> conditions of all devices implemented as part of project. <br /> 4. Consultant shall prepare as-built plans for any and all improvements that required <br /> design plans for project in Sub-Task 3.1. <br /> At the conclusion of construction, produce As-Built record drawings in both <br /> electronic and hard copy format of all improvements. The electronic copy shall <br /> include both original file format(AutoCAD/MicroStation) and PDF. Hard copy shall <br /> include one full size (36"x24") set of plans, on mylar for City records and one set <br /> on bond paper.A copy of both formats(electronic and hard copy) shall be provided <br /> to each Partner Agency. <br /> Deliverables - Task 3: <br /> 1. Utility coordination documents and records, including all letters of requests, responses, <br /> as-built drawings, utility logs, Preliminary and Final Notices. <br /> 2. All permit application submittals and final issued permits. <br /> 3. Plans, specifications and estimates for 60% and 90% level design, in both hard copy <br /> and electronic copy format. Copies of each level of design shall be provided to each <br /> Partner Agency. <br /> 4. Review Comment and Resolution tracking log, in Excel format. <br /> 5. Original files of the PS&E for each level of design (60%, 90% & Final), including <br /> MicroStation/AutoCAD files, Word and Excel files. <br /> 6. Any design and quantity calculations. <br /> 7. Final PS&E package, signed and stamped by a California Licensed Professional <br /> Engineer. <br /> 8. Final PS&E package shall be in both electronic and hard copy. Electronic file shall be in <br /> PDF format. Hard copy shall include one full size (36"x24") set of plans, on bond for <br /> City records. Copies of Final design shall be provided to each Partner Agency. <br /> 9. Maintenance Memorandum during 60% submittal stage <br /> 10. Updated Cost Estimate for any additional improvements not included in this document <br /> 11. Procure and install any and all equipment as specified, and/or necessary, to make <br /> the proposed systems operate as originally intended, per this Scope of Work and <br /> Attachments or Appendices. <br /> 12. Negotiate with City of Santa Ana and Agency representatives on alternative <br /> procurements or substitutions as deemed necessary during the course of the <br /> project. <br /> 13. All WARRANTIES and GUARANTIES as specified. <br /> 14. All documentation shall be supplied to City of Santa Ana and Agencies in two hard <br /> copies and electronic copies. <br /> 15. Construction engineering and management records and files, including, but not limited <br /> to: <br /> a. Pre-Construction meeting agenda and notes <br /> b. Construction progress meeting minutes and notes <br /> c. Submitted shop drawings and materials submittals and subsequent <br /> reviews and responses <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.