• CITY OF SANTA ANA <br /> used to compare actual conditions to anticipated conditions dictated by the Tru-Traffic <br /> time- space diagram so that any anomalies may be corrected prior to the 'After' studies <br /> task. <br /> Deliverables - Task 4: <br /> 1. Excel Files of pedestrian and vehicle clearance intervals. <br /> 2. Concept of Operations Report including Scenarios Report. <br /> 3. Memorandum documenting the signal timing optimization and implementation. <br /> 4. All optimized and synchronized traffic signal timing plans, including existing corridor <br /> conditions and improved corridor conditions customized. <br /> 5. Field implementation of optimized traffic signal plans for existing corridor conditions, <br /> including all required fine-tuning. <br /> 6. Electronic versions of files from all Traffic Signal Modeling Software programs used in <br /> project. <br /> 7. Electronic versions of all other data files and memorandums. <br /> 8. Deliverables of final plans of other participating neighbor Agency to each participating <br /> Agency for timing shall only be the coordinated timing intervals and time of day plans. <br /> And, they shall be limited to one to three signalized intersections on each side of their <br /> respective political boundaries or as approved by participating neighbor Agency. <br /> V. Task 5: Project Report <br /> A. Consultant shall prepare a Project Report with an executive summary. The report shall <br /> provide complete documentation of the project, including, but not limited to: <br /> 1. Project scope, objectives, locations, findings, and recommendations <br /> 2. Data collected: counts, travel time studies, and project benefits achieved in <br /> terms of fuel savings, travel time, and other measurable parameters <br /> 3. For each intersection: lane configurations,signal phasing, turning movement data, <br /> and cycle lengths for existing and proposed timings for all peak periods <br /> 4. All work performed for system construction and signal timing optimization <br /> 5. Implementation schedule and improvements accomplished, including dates <br /> 6. Procedures for continuing maintenance, surveillance, and evaluation of the <br /> coordinated signal system <br /> The report shall document all planned and programmed improvements on the <br /> study corridor as well as recommendations based on PI tasks for further <br /> infrastructure improvements that would likely improve the corridor signal <br /> coordination project results. Consultant shall present the final report and results <br /> of the project to the Santa Ana and Partner Agencies. The report shall be <br /> completed in accordance with the current CTFP Guidelines. <br /> Finally, the report shall provide recommendations with cost and benefit estimates <br /> for future improvements to traffic signal infrastructure (signal controllers, vehicle <br /> detection, communications, etc.), intersection capacity (appropriate signal <br /> phasing, lane strategies. These proposed improvements should be useful in <br /> determining future enhancements to the corridor. <br /> 22 <br />