My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ <br />14. Whether or not the spill was located within 1,000 feet of a municipal surface water <br />intake. <br />3.2.3. Amended Certified Spill Reports for Individual Category 2 Spills <br />The Enrollee shall update or add additional information to a Certified Spill Report within <br />90 calendar days of the spill end date by amending the report or by adding an <br />attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database. <br />The Enrollee shall certify the amended report. <br />After 90 calendar days, the Enrollee shall contact the State Water Board at <br />San itarySewer_waterboards.ca.gov to request to amend a Spill Report. The Legally <br />Responsible Official shall submit justification for why the additional information was not <br />reported within the Amended Spill Report due date. <br />3.3. Monthly Certified Spill Reporting for Category 3 Spills <br />The Enrollee shall report and certify all Category 3 spills to the online CIWQS Sanitary <br />Sewer System Database within 30 calendar days after the end of the month in which <br />the spills occurred. (For example, all Category 3 spills occurring in the month of <br />February shall be reported and certified by March 30t"). After the Legally Responsible <br />Official certifies the spills, the online CIWQS Sanitary Sewer System Database will <br />issue a spill event identification number for each spill. <br />The monthly reporting of all Category 3 spills must include the following items for each <br />spill: <br />1. Contact information: Name and telephone number of Enrollee contact person to <br />respond to spill -specific questions; <br />2. Spill location name; <br />3. Date and time the Enrollee was notified of, or self -discovered, the spill; <br />4. Operator arrival time; <br />5. Estimated spill start date and time; <br />6. Description, photographs, and GPS coordinates where the spill originated: <br />o If a single spill event results in multiple appearance points, provide GPS <br />coordinates for the appearance point closest to the failure point and describe each <br />additional appearance point in the spill appearance point explanation field; <br />7. Estimated total spill volume exiting the system; <br />8. Description and photographs of the extent of the spill and spill boundaries; <br />9. Did the spill reach a drainage conveyance system? If Yes: <br />o Description of the drainage conveyance system transporting the spill; <br />o Photographs of the drainage conveyance system entry Iocations(s); <br />o Estimated spill volume fully recovered from the drainage conveyance system; and <br />ATTACHMENT E1 — NOTIFICATION, MONITORING, REPORTING <br />AND RECORDKEEPING REQUIREMENTS December 6, 2022 <br />E1 - 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.