My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ <br />Table E2-2 <br />Spill Category 2: Spills of 1,000 Gallons or Greater That Do Not Discharge to Surface <br />Waters <br />Spill <br />Requirements <br />Due <br />Method <br />Within two (2) hours of the Enrollee's knowledge of <br />California Office of <br />a Category 2 spill of 1,000 gallons or greater, <br />Emergency <br />discharging or threatening to discharge to waters of <br />Services at: (800) <br />Notification <br />the State: <br />852-7550 <br />Notify California Office of Emergency Services and <br />(Section 1 of <br />obtain a notification control number. <br />Attachment E1) <br />Monitoring <br />Conduct spill -specific monitoring. <br />(Section 2 of <br />Attachment E1) <br />• Submit Draft Spill Report within three (3) <br />business days of the Enrollee's knowledge of the <br />spill; <br />Reporting <br />. Submit Certified Spill Report within 15 calendar <br />(Section 3.2 of <br />Attachment E1) <br />days of the spill end date; and <br />• Submit Amended Spill Report within 90 calendar <br />days after the spill end date. <br />ATTACHMENT E2 — SUMMARY TABLES FOR NOTIFICATION, December 6, 2022 <br />MONITORING AND REPORTING REQUIREMENTS <br />E2-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.