My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ <br />Table E2-3 <br />Spill Category 3: Spills of Equal or Greater than 50 Gallons and Less than 1,000 Gallons <br />That Does Not Discharge to Surface Waters <br />Spill <br />Requirements <br />Due <br />Method <br />Notification <br />Not Applicable <br />Not Applicable <br />Monitoring <br />Conduct spill -specific monitoring. <br />(Section 2 of <br />Attachment E1) <br />• Submit monthly Certified Spill Report to the online <br />CIWQS Sanitary Sewer System Database within <br />30 calendars days after the end of the month in <br />(Section 3.3 and 3.5 of <br />Reporting <br />which the spills occur; and <br />Attachment E1) <br />• Submit Amended Spill Reports within 90 calendar <br />days after the Certified Spill Report due date. <br />Table E2-4 <br />Spill Category 4: Spills Less Than 50 Gallons That Do Not Discharge to Surface Waters <br />Spill <br />Requirements <br />Due <br />Method <br />Notification <br />Not Applicable <br />Not Applicable <br />Monitoring <br />Conduct spill -specific monitoring. <br />(Section 2 of Attachment <br />E1) <br />• If, during any calendar month, Category 4 spills <br />occur, certify monthly, the estimated total spill <br />volume exiting the sanitary sewer system, and the <br />total number of all Category 4 spills into the online <br />CIWQS Sanitary Sewer System Database, within <br />30 days after the end of the calendar month in <br />(Section 3.4, 3.6, 3.7 <br />Reporting <br />which the spills occurred. <br />and 4.4 of Attachment <br />E1) <br />• Upload and certify a report, in an acceptable digital <br />format, of all Category 4 spills to the online CIWQS <br />Sanitary Sewer System Database, by February 1st <br />after the end of the calendar year in which the <br />spills occur. <br />ATTACHMENT E2 — SUMMARY TABLES FOR NOTIFICATION, December 6, 2022 <br />MONITORING AND REPORTING REQUIREMENTS <br />E2-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.