My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 8: System Evaluation, Capacity Assurance <br />y of Santa Ana and Capital Improvements <br />Two separate funds support the City's Capital Improvement Program (CIP). The Sanitary Sewer Service fund is <br />allocated for maintenance, rehabilitation and repair and replacement of sanitary sewer facilities, as well as <br />emergency response to sewer blockage issues. The Sewer Connection Fee fund is allocated solely for the <br />construction of sewer capacity enhancements. The City balances the rehabilitation projects on a year-to-year <br />basis and aims to improve the operating efficiency and life expectancy of the entire sewer system. Sewer service <br />rates are periodically reviewed and adjusted to address identified CIP needs. <br />8.3.2 Supporting Documents <br />The following documents, attached as appendices, support the City's System Evaluation and Capacity Assurance <br />Plan, thereby allowing the City to comply with the System Evaluation and Capacity Assurance Plan requirements <br />of the WDR: <br />0 The City of Santa Ana Standard Plans for Sanitary Sewers, Public Works Agency, Appendix F. <br />Additionally, the following documents also support the City's System Evaluation and Capacity Assurance Plan, <br />and are available from the City's Water Resources Division. Due to the size of these documents, they have not <br />been attached as appendices. <br />• City of Santa Ana Sewer Master Plan — Final Report, December 2016 <br />2025 8-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.