My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Centennial Park Sports Lighting
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025
>
Item 14 - Centennial Park Sports Lighting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 9:05:27 AM
Creation date
10/15/2025 9:04:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
14
Date
10/21/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
System Requirements: Control <br /> Project Name:Centennial Regional Park I Project#:223727 <br /> Control System ID:1 of 1 <br /> • Y Distribution Panel Location/ID:Service#1 <br /> Project Information �Lj• � <br /> Control System �� � Project Notes: <br /> Control System ID: <br /> Control System Type: Control-Link*!,4tro1 and Monitoring <br /> System <br /> Communication Type: •`owerLine-ST <br /> Power RequirementsEquipment Listing <br /> Control cabinet(s): <br /> Control voltage(phase to neutral) 120/60 Description <br /> VA loading-Inrush / i� 3268.0 Control and monitoring cabinet- 1 24 X 72 <br /> VA loading-Sealed ^ (,J' 362.0 primary <br /> Lighting Circuits: �` Contactors,30 amperes 11 <br /> Voltage/Hertz/PhNpeN'�� 480/60/3 Off/On/Auto switches 6 - <br /> C) <br /> Important Notes: <br /> 1. Please confirm that the lighting circuit voltage listed above is accurate for this facility.This is the voltage/phase being <br /> connected and utilized at each lighting pole's electrical components enclosure disconnect.Inaccurate voltage/phase can <br /> result in additional costs and delays.Contact your Musco sales representative to confirm this item. <br /> 2. In a 3 phase design,all 3 phases are to be run to each pole location.Musco's single phase luminaires come pre-wired to utilize <br /> all 3 phases across the entire facility. <br /> 3. One contactor is required for each circuit at each pole location.Contactors are 3 pole and 100%rated for the published <br /> continuous load. <br /> 4. If the lighting system will be fed from more than one distribution location,additional equipment may be required.Contact <br /> your Musco sales representative. <br /> 5. Size overcurrent devices using the full load amps column of the Circuit Summary by Switch chart(Minimum power factor is <br /> 0.9).Size conduit per code unless otherwise specified as larger to allow for harness connectors. <br /> 6. Avoid use of in-ground junction/pull boxes when possible.If used,the following best practices must be followed: <br /> •Underground handholes(pull boxes)must be supported to prevent settling.Boxes buried directly in soil,without support, <br /> are not allowed. <br /> •Use polymer concrete lids marked with ELECTRIC for underground handholes.Steel lids are not allowed. <br /> •Avoid underground connections when possible.If used,all wire connectors must be UL listed for Wet Locations to prevent <br /> leakage current. <br /> 7. Control power wiring must be in separate conduit from line or load power wiring.Communication cables must be in separate <br /> conduit from any power wiring. <br /> 8. Test wire per ANSI/NETA ATS-2021.Wires with insulation resistance less than 100 MOhms,in water-filled conduit,must be <br /> replaced. <br /> 9. Refer to Installation Instructions for more details on equipment information and the installation requirements. <br /> Sales Representative:Mike Marchetti I Project Engineer:Daniel Lohman I Scan:223727C I Document ID:223727P1 V4C2-0526151729 <br /> r�SCE <br /> Page 1 of 3--26-May-2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.