Laserfiche WebLink
System Requirements: Control <br /> Project Name:Centennial Regional Park I Project#:223727 <br /> Control System ID:1 of 1 <br /> Distribution Panel Location/ID:Service#1 <br /> Equipment Layout and Connection Details <br /> Lighting system <br /> Control cabinet location(s) <br /> I <br /> t2a, o <br /> 0 j <br /> i <br /> i <br /> I <br /> i 1-b- <br /> Connection Details Equipment <br /> MDescription Description <br /> 1 a Line power to contactors,and equipment grounding conductor.Requires one 1 Control and monitoring cabinet- <br /> circuit per contactor,size wiring per load and voltage drop. primary <br /> 1 b Load power from contactors,and equipment grounding conductor.Requires <br /> one circuit per contactor,size wiring per load and voltage drop. <br /> 2a Control power with equipment ground to control cabinet.Requires dedicated <br /> 20 A circuit.Provide transformer if control voltage not present. <br /> Sales Representative:Mike Marchetti I Project Engineer:Daniel Lohman I Scan:223727C I Document ID:223727P1 V4C2-0526151729 <br /> hfusco. <br /> Page 2 of 3--26-May-2025 <br />