My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Agreement to Conduct the Vision Zero Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
11/04/2025
>
Item 16 - Agreement to Conduct the Vision Zero Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 1:35:38 PM
Creation date
10/29/2025 1:27:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
11/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The Consultant shall provide all necessary services to perform the following tasks: <br />C. PROJECT TASKS <br />Task 1: Project Management: <br />o <br />o <br />The City shall be the lead agency for the Santa Ana Vision Zero Plan Update, and the <br />designated City Project Manager will coordinate project management through the Traffic <br />Engineering Section of the Public Works Agency. <br />The Consultant shall be expected to interface both locally with City staff and with other <br />affected agencies as necessary, as well as participating in discussions and <br />presentations with the wider design team at periodic milestones as per consultant <br />recommendations. In order to ensure a timely progression of the project from inception <br />to final deliverable, the following activities should be anticipated once the Notice to <br />Proceed (NTP) is authorized and as the Project progresses: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project Kick-off Meeting <br />Weekly PDT Meetings <br />6 Community Meetings (one community meeting at each City’s Ward) <br />Project Schedule Management <br />Monthly Progress Reports <br />Monthly Cost Accounting <br />Quality Assurance / Quality Control <br />o Of particular importance is the monthly PDT Meetings. The consultant shall prepare, <br />update, and provide City staff with a punch list prior to meetings. City staff will be <br />participating and guide the development of the SAVZ Plan Update throughout the <br />process. <br />Task 2: Data Collection: <br />Data collection will include, but not be limited to; traffic counts, collision data for the pasto <br />ten years, posted speed limits, 85% tile speed limits, lane configurations, street <br />classification, lane widths, traffic citations, street lighting, trees, transit stops, transit <br />boarding/alighting, street crossings, and adjacent land uses. Data collected from the <br />existing Santa Ana Vision Zero Plan may be re-used, as needed. <br />Task 3: Community Outreach Surveys & Stakeholder Engagement: <br />o <br />o <br />o <br />Engage with key stakeholders including City staff, transportation authorities, community <br />groups, and residents. <br />Conduct one community meeting/workshop for each City of Santa Ana’s Ward, a total of <br />six (6) meetings. <br />Gather input/feedback/recommendations on safety concerns, priorities for <br />improvements, and community-specific needs related to the selected corridors. <br />Task 4: Analysis:
The URL can be used to link to this page
Your browser does not support the video tag.