My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Agreement to Conduct the Vision Zero Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
11/04/2025
>
Item 16 - Agreement to Conduct the Vision Zero Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 1:35:38 PM
Creation date
10/29/2025 1:27:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
11/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Implementation of traffic calming measures (speed humps/cushions, new or mod. <br />traffic signals, etc.). <br /> <br /> <br /> <br /> <br />Enhanced crosswalks and pedestrian signals. <br />Dedicated bike lanes or shared-use paths. <br />Improved street lighting and signage. <br />Implementation of landscaped concrete mediums. <br />Task 8: Implementation Plan: <br />o <br />o <br />Create a detailed implementation plan outlining the timeline, responsibilities, and budget <br />for each safety strategy. <br />Coordinate with relevant City departments and agencies to ensure alignment with <br />broader transportation and urban planning initiatives. <br />Task 9: Develop Cost Estimates: <br />o Cost estimates shall be prepared for each corridor/street segment. Based on the <br />corridor/street segment Conceptual Engineering Plans/drawings developed, quantities <br />will be generated, and unit pricing applied to prepare a conceptual level cost estimate <br />using the ATP Cost Estimate format. Unit costs will be determined based on the <br />following: <br /> <br /> <br /> <br />Review of local City examples <br />Review of other agencies <br />Collaboration with City staff <br />o The cost estimates will be prepared for each of the seven (7) corridor/street segments. <br />Project cost estimates will be reviewed with City staff to verify estimated cost by project <br />phase to position for successful implementation: <br />Task 10: Draft and Final Vision Zero Plan Update: <br />o Draft Vison Zero Plan Update <br />The consultant shall update the Santa Ana Vision Zero Plan into a Draft Update <br />to include the new corridor/street segments. As needed, the other maps, tables, <br />exhibits, appendices, etc. related to the addition of the seven (7) new <br />corridor/street segments, plans/recommendations, and any relevant information, <br />will be updated. The community engagement section shall also be updated to <br />include summaries of the six workshops in each City ward. This plan will be <br />provided to the City for review for two rounds of revisions. <br />o Final Vison Zero Plan Update <br />Upon completion of the City’s review, comments will be addressed. The <br />consultant shall develop a Final Vision Zero Plan Update to include all <br />components mentioned above in the Scope of Work. This plan will be provided to <br />the City for review for two rounds of revisions. Ten (10) hard copies (and one <br />electronic) of the final plan will be printed and delivered.
The URL can be used to link to this page
Your browser does not support the video tag.