Laserfiche WebLink
r SCOPE OF WORK <br /> in the plan. This shall include 2 letter R's, 16"cross and all 12" and 24" limit bars. <br /> RR sign installation is not included. <br /> D. Install Speed Hump Chevron Marking: The unit price for installing Speed <br /> Hump Chevron marking shall include full compensation for furnishing labor, <br /> materials, tools, equipment and other incidentals to install one triangular and one <br /> chevron marking on the speed hump per detail shown in the standard plan. Sign <br /> and Bump legend installation are not included. <br /> E. Install Raised Pavement Markers (RPM): The unit price for installing RPM <br /> shall include full compensation for furnishing labor, materials, tools, equipment, <br /> RPM and other incidentals to install the RPM as called for individually or per RPM <br /> Details in Standard Plan 1125C. <br /> F. Install Sign Post: Shall include full compensation for furnishing labor, <br /> materials, tools, equipment, post, post anchor and other incidentals to install the <br /> post as shown in the plan. <br /> G. Install Sign: Shall include full compensation for furnishing labor, mounting <br /> hardware, tools, equipment and other incidentals for installing the sign as shown on <br /> the plan. Cost of sign is not included. <br /> H. Install Flexible Type K Marker: Shall include full compensation for furnishing <br /> labor, materials, mounting hardware/epoxy, tools, equipment and other incidentals <br /> for installing the marker. <br /> I. Install Bot Dots: Shall include full compensation for furnishing labor, <br /> materials, mounting hardware/epoxy, tools, equipment and other incidentals for <br /> installing the bat dot. <br /> J. Install Bolt Down Traffic Delineator: Shall include full compensation for <br /> furnishing labor, materials, mounting hardware/epoxy, tools, equipment and other <br /> incidentals for installing the delineator. <br /> K. Install Bolt Down Q Marker: Shall include full compensation for furnishing <br /> labor, materials, mounting hardware/epoxy, tools, equipment and other incidentals <br /> for installing the marker. <br /> L. Install PEXCO City Post: Shall include full compensation for furnishing <br /> labor, materials, mounting hardware/epoxy, tools, equipment and other incidentals <br /> for installing the PEXCO City Post. See Appendix 26.1. <br /> M. Install Traffic Barrier and Guardrail: Shall include full compensation for <br /> furnishing labor, materials, mounting hardware, tools, equipment and other <br /> incidentals for installing the 12-foot 6-inch wide section with two treated posts and <br /> end pieces per SA Plan 1114. <br /> City of Santa Ana Page 21 of 71 <br />