My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-12-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
12/02/2025
>
Agenda Packet_2025-12-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 8:24:54 AM
Creation date
11/26/2025 8:18:49 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
12/2/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana California Environmental Quality Act <br />Mitigation Monitoring and Reporting Plan <br /> <br />- 3 - <br />Santa Ana Zoo Stormwater Capture and Diversion MND <br />Mitigation Monitoring and Reporting <br />Mitigation Measure Implementation <br />Party <br />Implementation <br />Phase <br />Monitored <br />By <br />Outside <br />Agency <br />Coordination <br />➢ All haul trucks leaving or entering the site shall <br />be covered or have at least two feet of <br />freeboard. <br />➢ Any on-site stockpiles of debris, dirt or other <br />dusty material shall be covered or watered <br />twice daily. <br />➢ Any site access points within 30 minutes of any <br />visible dirt deposition on any public right of way <br />shall be mechanically or manually swept. <br />BIO-1 <br />Prior to ground-disturbing activities in areas that could <br />support sensitive biological resources, a habitat <br />assessment shall be conducted by a qualified biologist <br />to determine the potential for special-status wildlife <br />species to occur within affected areas, including areas <br />directly or indirectly impacted by construction or <br />operation of the Project. If a special-status wildlife <br />species is found, pre-construction surveys of proposed <br />work zones should be conducted 14 days prior to <br />construction. Areas including construction areas, <br />staging areas, and rights-of-way, should be staked, <br />flagged, fenced, or otherwise clearly delineated to <br />restrict the limits of construction to the minimum <br />necessary near areas that may support special-status <br />wildlife species with special-status wildlife species; if <br />avoidance is not possible, the City of Santa Ana should <br />consult with the appropriate regulating agency, such as <br />City of Santa Ana Pre-Construction City of Santa <br />Ana <br />United States <br />Army Corps of <br />Engineers <br /> <br />United States <br />Fish and <br />Wildlife Service <br /> <br />California <br />Department of <br />Fish and <br />Wildlife <br /> <br /> <br />City Council 15 – 111 12/2/2025
The URL can be used to link to this page
Your browser does not support the video tag.