My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-12-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
12/02/2025
>
Agenda Packet_2025-12-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 8:24:54 AM
Creation date
11/26/2025 8:18:49 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
12/2/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana California Environmental Quality Act <br />Mitigation Monitoring and Reporting Plan <br /> <br />- 4 - <br />Santa Ana Zoo Stormwater Capture and Diversion MND <br />Mitigation Monitoring and Reporting <br />Mitigation Measure Implementation <br />Party <br />Implementation <br />Phase <br />Monitored <br />By <br />Outside <br />Agency <br />Coordination <br />the United States Army Corps of Engineers (USACE), <br />United States Fish and Wildlife Service (USFWS), or <br />California Department of Fish and Wildlife (CDFW), to <br />determine a strategy for compliance with the <br />Endangered Species Act, California Fish and Wildlife <br />Code, or other regulations supporting special-status <br />species. The City of Santa Ana will work together with <br />those regulating agencies to determine appropriate <br />impact minimization measures and compensation for <br />any permanent impacts due to the Project. If no <br />breeding and nesting birds and/or raptors are found, <br />then construction may proceed as scheduled with no <br />additional monitoring or measured required. <br />BIO-2 <br />To protect nesting birds that may occur on site or <br />adjacent to the Project boundary, no construction shall <br />occur from February 1 through September 15, as early <br />as January 1 for some raptors, unless a qualified <br />biologist completes a survey for nesting bird activity <br />within a 500-foot radius of the construction site. The <br />nesting bird surveys shall be conducted at appropriate <br />nesting times and concentrate on potential roosting or <br />perch sites. The City of Santa Ana should require <br />surveys be conducted by a qualified biologist no more <br />than 7 days prior to the beginning of any Project- <br />related activity likely to impact raptors and migratory <br />songbirds, for the entire Project site. If Project <br />activities are delayed or suspended for more than 7 <br />days during the breeding season, the surveys shall be <br />City of Santa Ana Pre-Construction City of Santa <br />Ana <br />California <br />Department of <br />Fish and <br />Wildlife <br /> <br /> <br />City Council 15 – 112 12/2/2025
The URL can be used to link to this page
Your browser does not support the video tag.