My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MUSCO SPORTS LIGHTING, LLC (2)
Clerk
>
Contracts / Agreements
>
M
>
MUSCO SPORTS LIGHTING, LLC (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2025 4:06:39 PM
Creation date
12/15/2025 4:05:52 PM
Metadata
Fields
Template:
Contracts
Company Name
MUSCO SPORTS LIGHTING, LLC
Contract #
A-2025-178
Agency
Public Works
Council Approval Date
10/21/2025
Expiration Date
12/31/2026
Insurance Exp Date
7/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
System Requirements: <br /> F\ project Name;Centennial Regional Park I Project 0;223727 <br /> Control System ID:1 of 1 <br /> Distribution Panel LocatlonAD:Service 91 <br /> Project Information <br /> Control System <br /> roject Notes: <br /> Control System Ili: <br /> Control System Type; Control-Link trol and MAPring <br /> Oro <br /> 0_6 <br /> System <br /> Communication Type; � ANerLine-ST <br /> Power Require <br /> Equipmentrill <br /> Cnn#roi cabinet(s): � ' �' <br /> Control volta � •g ' �e to neufi�I) 120/60 <br /> VA loading-Irlruh 14 3268,0 Control and monitoring cabinet- 1 24 X 72 <br /> VA loading-Sealed 362,0 primary <br /> Lighting Circuits: 's Contactors,30 amperes 11 - <br /> Voltage/Hertz/Ph A' 480/60/3 <br /> Off/On/Auto switches 6 <br /> Import ing ates: <br /> 1. Please confirm that the lighting circuit voltage listed above is accurate for this facility.This is the voltage/phase being <br /> connected and utilized at each lighting pole's electrical components enclosure disconnect.Inaccurate voltage/phase can <br /> result in additional costs and delays,Contact your Musco sales representative to confirm this item. <br /> 2. In a 3 phase design,all 3 phases are to be run to each pole location.Musco's single phase luminaires come pre-wired to utilize <br /> all 3 phases across the entire facility. <br /> 3. One contactor is required for each circuit at each pole location,Contactors are 3 pole and 100%rated for the published <br /> continuous load. <br /> 4. If the lighting system will be fed from more than one distribution location,additional equipment may be required.Contact <br /> your Musco sales representative, <br /> 5. Size overcurrent devices using the full load amps column of the Circuit Summary by Switch chart(Minimum power factor Is <br /> 0,9).Size conduit per code unless otherwise specified as larger to allow for harness connectors. <br /> 6. Avoid use of in-ground junction/pull boxes when possible.If used,the following best practices must be followed; <br /> •Underground handholes(pull boxes)must be supported to prevent settling.Boxes buried directly in soil,without support, <br /> are not allowed. <br /> •Use polymer concrete lids marked with ELECTRIC for underground handholes.Steel lids are not allowed. <br /> •Avoid underground connections when possible.If used,all wire connectors must be UL listed for Wet Locations to prevent <br /> leakage current. <br /> 7. Control power wiring must be In separate conduit from line or load power wiring.Communication cables must be In separate <br /> conduit from any power wiring. <br /> 8. Test wire per ANSI/NETA ATS-2021.Wires with Insulation resistance less than 100 MOhms,In water-filled conduit,must be <br /> replaced. <br /> 9. Refer to Installation Instructions for more details on equipment Information and the installation requirements, <br /> �33 Sales Representative:Mike Marchetti I Project Engineer:Daniel Lohman I Scan:223727C I Document ID;223727P1v4C2.0526151729 <br /> W&� S`C®- <br /> Page 1 of 3--26-May-2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.