Laserfiche WebLink
ControlSystem Requirements: <br /> Project Name:Centennial Regional Park I Project N:223727 <br /> Control System ID:1 of 1 <br /> Equipment Layout and Connection Details Distribution Panel LocationllD:Service III <br /> Lighting system <br /> at ; <br /> i <br /> �.l <br /> a <br /> Control cabinet location(s) <br /> 2ti <br /> I 1 <br /> rV�'4 I <br /> l}� <br /> !I <br /> ib <br /> L! <br /> F— <br /> Connection � <br /> nt <br /> ID Description Description <br /> la Line power to contactors,and equipment grounding conductor.Requires one 1 Control and monitoring cabinet- <br /> circuit per contactor,size wiring per load and voltage drop, primary <br /> 1 b Load power from contactors,and equipment grounding conductor.Requires <br /> one circuit per contactor,size wiring per load and voltage drop. <br /> 2a Control power with equipment ground to control cabinet,Requires dedicated <br /> 20 R circuit.Provide transformer if control voltage not present. <br /> Sales Representative:Mike Marchetti I Project Engineer:Daniel Lohman I Scan:223727C I Document ID:223727P1 V4C2-0526151729 <br /> MUjCOL r <br /> Page 2 of 3--26-May-2025 <br />