My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MERIDIAN RAPID DEFENSE GROUP, LLC.
Clerk
>
Contracts / Agreements
>
M
>
MERIDIAN RAPID DEFENSE GROUP, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2025 4:59:31 PM
Creation date
12/15/2025 4:58:56 PM
Metadata
Fields
Template:
Contracts
Company Name
MERIDIAN RAPID DEFENSE GROUP, LLC.
Contract #
A-2025-208
Agency
Police
Council Approval Date
12/2/2025
Expiration Date
12/1/2028
Insurance Exp Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� CITY OF SANTA ANA <br /> EXHIBIT A <br /> SCOPE OF WORK <br /> The City is soliciting competitive proposals from qualified vendors to furnish and deliver Hostile Vehicle <br /> Mitigation (HVM) Mobile Barrier Kits. <br /> A. SCOPE OUTLINE: The following scope for up to twenty (20) Hostile Vehicle Mitigation (HVM) Mobile <br /> Barrier Kits. The HMV Kits are to include Barriers, Accessories, and Drop Deck. Trailers, is divided into <br /> two complete sections.The first section outlines the overall specification requirement.The second section <br /> details the Mobile Barrier Kits with Trailers and Accessories. The equipment shall be delivered complete <br /> with all equipment and accessories necessary for safe and efficient operation, ready for immediate job <br /> site operation within the County of Orange. The mobile barrier kit and trailer shall comply with the <br /> manufacturer's current model mobile barrier kit and trailer, with additions and deletions as contained <br /> herein. <br /> B. DELIVERY SCHEDULE REQUIREMENTS: Given the fabrication requirements of the Hostile Vehicle <br /> Mitigation (HVM) Mobile Barrier Kits, we acknowledge the potential for build schedule delays. To ensure <br /> timely deployment, the first delivery shall consist of approximately eight (8) barrier kits and delivery shall <br /> be scheduled be no later than March 31, 2026. The unit(s) must be delivered and fully operational within <br /> the specified timeframe.We estimate a total of 8 barrier kits in our first delivery order. <br /> All subsequent orders must be fulfilled within six(6) months of an order date. <br /> If a proposed unit meets all other specification requirements but cannot meet the established delivery <br /> deadline, proposers must explicitly disclose this discrepancy in their bid submission. <br /> C. DELIVERY REQUIREMENTS AND LOCATION: <br /> Address: City of Santa Ana Corporate Yard <br /> 215 S. Center Street <br /> Santa Ana, CA 92703 <br /> Delivery Hours: 7:30 AM—4:00 PM <br /> Delivery Days: Monday—Friday <br /> D. INTENDED USE:. The unit proposed by proposers shall be designed and configured to meet or exceed <br /> the intended operational requirements specified herein. The units described are intended to provide <br /> passive, portable, pedestrian-friendly vehicle anti-ram protection at public polling places and various <br /> events, regardless of scale. <br /> E. MANUFACTURING, MATERIAL AND DESIGN PRACTICES: The manufacturer is expected to select <br /> components using industry-leading materials and design practices that are best suited to the operating <br /> conditions the unit(s)will encounter.All parts, equipment, and accessories shall meet recognized industry <br /> standards for strength, material quality, and craftsmanship. <br /> F. MANUFACTURER'S SPECIFICATION: Proposers shall provide a complete manufacturer's <br /> specification, including published literature and visual documentation, such as photos or illustrations, of <br /> the proposed unit. Only new models currently in production, officially cataloged by the manufacturer, and <br /> supported by printed literature and specifications will be considered. <br />
The URL can be used to link to this page
Your browser does not support the video tag.