Laserfiche WebLink
Docusign Envelope ID:EFBAEI2B-2D33-4288-BDF3-3F19BEEB5A,3F <br /> aCITY OF SANTA ANA <br /> 5. Power Supplies <br /> 6. Network Equipment <br /> 7. Servers <br /> B. Cleaning <br /> 1. Cameras (Excluding cameras within the Santa Ana City Jail) <br /> 2. Power Supplies <br /> 3. Antennas <br /> Based on testing and inspections as part of preventative maintenance, Contractor maintenance <br /> actions shall be provided in a quarterly report to City's Public Safety Video Surveillance System Project <br /> Manager. Contractor shall also maintain the same quarterly reports as part of the City's account <br /> documentation. Contractor must provide all system software updates as they become available and <br /> on an annual basis. <br /> Vill. REPAIR AND REPLACE PROCEDURES <br /> Repair and replacement of worn, failed, or malfunctioned equipment must be provided during normal <br /> business hours, within a maximum of four (4) business days. Should the service be of critical or of an <br /> emergency nature, vendor shall provide response, diagnose the issue, and have begun the repair <br /> process within a maximum of four (4) hours of having been notified or made aware of issue. Contractor <br /> may provide temporary replacement from already existing stock (if available) and provide ETA for <br /> permanent replacement parts and equipment. The contractor is responsible for providing all equipment <br /> necessary to complete the repair/replacement.After-hours and weekend service shall be available should <br /> repair/replace be determined by the City to be of a critical or emergency nature. Additionally, Contractor <br /> shall provide City a description of how they intend to calculate costs for any repair or replacement <br /> services, labor rate(s)for services provided during regular business hours and for urgent requests during <br /> after-hours, parts, supplies, materials and equipment, etc. that fall outside the scope of services of a <br /> resulting maintenance agreement or warranty. This includes an explanation of any standardized <br /> methodology used (i.e. "Time & Materials" charge, hourly labor rates, etc.). All labor shall be billed at <br /> previously agreed upon rates under the awarded agreement. The repair and replacement includes any <br /> newly installed equipment. <br /> IX. SYSTEMS INTEGRITY, MONITORING, AND DIAGNOSTIC REPORTING <br /> Contractor shall provide real-time, 2417 monitoring of system components (servers and storage, core <br /> network and edge network components). Health monitoring of the system is critical to the maintenance <br /> of state-mandated archiving requirements. The monitoring process should be able to maintain reliability, <br /> system uptime, optimized configurations of hardware and software, and for diagnostic reporting that <br /> reduces life-cycle costs to the system. <br /> Contractor shall provide City, within the body of their proposal, a detailed explanation of how they will <br /> provide monitoring services, what system(s) will be used, and what the work-flow will look like in terms <br /> of alerting mechanisms and corresponding adjudication of alerts/alarms. <br /> X. VIDEO ARCHIVING WARRANTY <br /> Vendor shall assess and guarantee that video archiving and retention is compliant with California <br /> Government Code 34090.6. Diagnostic reporting supported by storage calculation data and showing <br /> compliance s shall be provided to the City's Project Manager or designee on a quarterly basis. <br /> High-resolution video footage, inclusive of audio, shall be retained for a minimum of 365 days (1 year). <br /> High resolution is defined as a minimum of 1920x1080 (1080p) at 15 frames per second (fps). For the <br /> Santa Ana City Jail specifically (approximately 345 cameras), video retention shall extend to two years, <br /> with the second year stored at a reduced resolution or using compression. <br /> RFP 25-109A City of Santa Ana Page 24 of 51 <br />