My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Agreement for Pool Maintenance and Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
01/20/2026
>
Item 25 - Agreement for Pool Maintenance and Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:51:01 PM
Creation date
1/14/2026 9:40:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25
Date
1/20/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) <br />FOUNTAIN MAINTENANCE: <br />1. Location <br />CITY OF SANTA ANA <br />Fountain <br />Location <br />Service Per Week+ <br />Plaza of the Fountain #1* <br />North of State Building <br />3 Times <br />Plaza of the Fountain #2* <br />East of Law Library <br />3 Times <br />Plaza of the Fountain #3* <br />South of Law Library <br />3 Times <br />Plaza of the Sun Fountain <br />Between City Hall and Main <br />Library <br />3 Times <br />Sasscer Park Fountain <br />Corner of Santa Ana Blvd. and <br />Broadway <br />3 Times <br />2nd Street Mall Fountain <br />Between Sycamore St. and <br />Broadway <br />3 Times <br />Santa Ana Regional <br />Transportation Center <br />SARTC <br />1000 E Santa Ana Blvd <br />3 Times <br />*Currently out of service <br />+Monday, Wednesday, Friday <br />SPLASH PAD MAINTENANCE: <br />1. Location <br />Splash Pad <br />Location <br />Service Per <br />Week+ <br />Portola Park <br />1700 E Santa Clara Ave <br />3 Times <br />Thornton Park* <br />1801 W Segerstrom Ave <br />3 Times <br />*Future Site <br />+Monday, Wednesday, Friday <br />2. Specific (required as needed): <br />a) Service is required once a week generally Sunday through Saturday or as directed by the Public Works <br />Executive Director or designee. <br />b) Provide chlorine and acid required to maintain as needed. (Under normal conditions, chlorine and acid <br />are included.) <br />c) Maintain all equipment at the optimal parameters: pumps, filters debris traps, time clocks, flow rates, <br />GPM's and vault lighting. <br />d) Maintain operation of touch pad sensors <br />e) Maintain service chart. <br />f) Keep pump enclosure areas clean of trash dirt and debris. <br />g) Keep all splash pad component including the play surface free from calcium build up, any growth like <br />algae, insects, etc. <br />City of Santa Ana RFP 25-120 Page 30 of 52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.