My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Award of a Construction Contract for Bristol St and Memory Lane Intersection
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Item 14 - Award of a Construction Contract for Bristol St and Memory Lane Intersection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:34:13 AM
Creation date
2/11/2026 7:52:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
14
Date
2/17/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements — Project No. 17-E883 <br />Certified 1990 FEISIEIR Mitigation Measures:. Refer to 1990 FEISIEIR Mitigation Measures H-1 through H 3 <br />and H-5 through H-1. <br />Mitigation Measures: No additional new mitigation measures are required. <br />e) Create objectionable odors affecting a substantial number ofpeople? <br />Construction activities associated with the proposed Project may generate detectable odors from heavy-duty <br />construction equipment and exhaust- Odors associated with diesel and gasoline fumes are transitory in nature and <br />would not create objectionable odors affecting a substantial number of people. The impacts from these odors would <br />be short-term, would cease upon Project completion, and are not anticipated to be significant. Implementation of the <br />proposed Projectwould not result in greater impacts than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEISIEIR mitigation measures are applicable. <br />Mitigation Measures: No additional new mitigation measures are required. <br />3.4 BIOLOGICAL RESOURCES <br />This section corresponds with the 1990 FEISIEIR, Section IV, Environmental Consequences and A&igation <br />Measures, Subsection E, Sirecmabed Alociifacation. <br />Would the project: <br />uV Have a substantial adverse effecX. either dwettiy or through habitat modifications, on any species <br />idenWf led as a candidate, sensitive, or special status species in local or regional plans, policies, or <br />regulations, or by the California Department of Fish and Game or U.S Fish and Wr7dife Service? <br />The Project site is located within a highly -urbanized area within the City of Santa Ana. No sensitive natural habitat <br />or special -status species exist on or in the vicinity of the proposed Project Implementation of the proposed Project <br />would not result in greater impacts than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEISlEIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />b) Have a substantial adverse effect on any riparian habitat or other sensitive natriral community <br />identf led in local or regional plans, policies, regul&ons or by the California Department of Fish <br />and Game or US Fish and Wildlife Service? <br />Refer to Response 3.4(a). No riparian habitat or other sensitive natural communities are identified in the Project <br />vicinity. Implementation of the proposed Project would not result in greater impacts than previously analyzed in the <br />1990 FEIS/EIR. <br />Certified 1990 FEISIEIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable: <br />Mitigation Measures: No additional mitigation measures are required. <br />c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the <br />Clean Water Act (hw1u&W, but not limited to, marsh, vernal pool coastal, etc.) through direct <br />removd filling hydrological interruption, or other means? <br />Refer to Response 3.4(a). No federally protected wetlands are identified in the Project area or vicinity. The <br />proposed Project is located within a highly -urbanized area of the City of Santa Ana. Implementation of the <br />proposed Project would not result in greater impacts than previously analyzed in the 1990 FEIS/EIR. <br />Final I December 2017 3-7 Environmental Consequences <br />
The URL can be used to link to this page
Your browser does not support the video tag.