ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements — Project No. 17-E883 <br />Certified 1990 FEISIEIR Mitigation Measures- No 1990 FEISIEIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required <br />14 Interfere substandally with the movement of any native resident or migratoryfrsh or iWdUye species <br />or wiA established native resident or migratory wildlife corridors, or impede the use of native <br />wildlife nursery sites? <br />As the proposed Project is located within a highly -urbanized area of the City of Santa Ana, the Project would not <br />interfere with the movement of any native resident or migratory fish or wildlife species, corridors, or impede the use <br />of native wildlife nursery sites, as none are located within the Project area. Implementation of the proposed Project <br />would not result in greater impacts than previously analyzed in the 1990 FEISIEIR. <br />Certified 1990 FEISIEIR Mitigation Measures: No 1990 FEISIEIR mitigation measures are applicable <br />Mitigation Measures: No new additional mitigation measures are required. <br />ej Conflict withany local policies or ordinances protecting biological resources, stack as a tree <br />preservationpolicy or ordinance? <br />The proposed Project may result in the removal of existing landscaping, including trees. As such, removal or <br />planting of trees is required to comply with the City of Santa Ana Municipal Code, Chapter 33, Article VII, <br />Regulation ofthe planting, A,"ntenance, a Removal of Trees. With compliance with the City's Municipal Code, <br />the proposed Project would not conflict with the City's tree ordinance Implementation of the proposed Project <br />would not result in greater impacts than previously analyzed in the 1990 FEISIEIR. <br />Certified 1990 FEISIEIR Mitigation Measures: No 1990 FEISIEIR mitigation measures are applicable. <br />Mitigation Measures: No new additional mitigation measures are required. <br />,) Conflict with the provisions of an adopted habitat Conservation Plan, Natural Community <br />Conservation Plan, or odxer approved local regional; or state habitat conservation plan? <br />The Project site is not located within a habitat conservation plan. Implementation of the proposed Project would not <br />result in greater impacts than previously analyzed in the 1990 FEISIEIR. <br />Certified 1990 FEISIEIR Mitigation Measures: No 1990 FEISIEIR mitigation measures are applicable: <br />Mitigation Measures: No additional mitigation measures are required. <br />3.5 CULTURAL RESOURCES <br />This section corresponds with the 1990 FEISIEIR, Section IV, Environmental Consequences and Mitigation <br />Measures, Subsection T, Cultural Resources. <br />Would the project. <br />a) Cause a substantial a&erse change in the significance of a hutorrcal resource as de(m- ed in <br />§15a64.5? <br />No structure modification would result with implementation of the Project. Furthermore, the proposed Project <br />would only require limited depths of excavations (maximum depth of 10 feet). Although the majority of excavation <br />is anticipated to occur in non-native fill materials, should unknown potential historical resources be uncovered, <br />implementation of mitigation measure T-1 in the previously approved 1990 FEISIEIR would reduce irnp acts to less <br />than significant levels. Therefore, implementation of the proposed Project would not result in greater impacts than <br />previously analyzed in the 1990 FEISIEIR. <br />Final I December 2017 3-8 Environmental Consequences <br />