My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Award of a Construction Contract for Bristol St and Memory Lane Intersection
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Item 14 - Award of a Construction Contract for Bristol St and Memory Lane Intersection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:34:13 AM
Creation date
2/11/2026 7:52:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
14
Date
2/17/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements — Project No. 17-E883 <br />Certified 1990 FEISIEIR Mitigation Measures- No 1990 FEISIEIR mitigation measures are applicable: <br />Mitigation Measures: No additional mitigation measures are required. <br />bj Ponce Protection? <br />Refer to Response 3.14(a)(i). The proposed Project would not result in the need or increase the demand for police <br />services in the area. Impacts would not be greater than that previously analyzed in the 1990 FEISIEIR. <br />Certified 1990 FEISIEIR Mitigation Measures: No 1990 FEISIEIR mitigation measures are applicable: <br />Mitigation Measures: No additional mitigation measures are required. <br />e) .Schools? <br />The proposed Project does not involve any new development and no new population would result. Therefore, no <br />schools or school services would be impacted by the proposed Projer-t Impacts would not be greater than that <br />previously analyzed in the 1990 FEISIEIR. <br />Certified 1990 FEISIEIR Mitigation Measures: No 1990 FEISIEIR mitigation measures are applicable: <br />Mitigation Measures: No new additional mitigation measures are required. <br />40 Parks? <br />The proposed Project does not involve any new development and no new population would result. There are no <br />parks within the Project limits, and no needs for additional park services would occur as a result of the proposed <br />Project. Impacts would not be greater than that previously analyzed in the 1990 FEISIEIR. <br />Certified 1990 FEISIEIR Mitigation Measures: No 1990 FEISIEIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures arerequired. <br />e) Other publicfixgWes? <br />The proposed Project does not involve any new,development and no new population would. result Therefore, the <br />Project would not generate demands for other public facilities. Impacts would not be greater than that previously <br />analyzed in the 1990 FEISIEIR. <br />Certified 1990 FEISIEIR Mitigation Measures: No 1990 FEISIEIR mitigation measures are applicable: <br />Mitigation Measures: No additional mitigation measures are required. <br />3.15 RECREATION <br />This section corresponds with the I990 FEISIEIR, Section IV, -Environmental Consequences and Midpation <br />Akasnres, Subsection P, Impact on -Recreational Facilities. <br />uj Would the project increase the use of existing neighborhood and regional parks or other <br />recreational fac&ftes such that substafthal physical deterioration of the faeday would occur or be <br />accelerated? <br />The proposed Project involves the widening of Bristol Street, just north of Memory Lane, to accommodate a third <br />southbound through lane within a highly urbanized and Built -out area in the City, The widening of Bristol Street <br />would not induce growth, nor create demand for recreation -related services. Furthermore,. the proposed Project <br />Final I December 2017 3-24 Environmental Consequences <br />
The URL can be used to link to this page
Your browser does not support the video tag.