My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Award of a Construction Contract for Fire Station 71 Fuel Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Item 15 - Award of a Construction Contract for Fire Station 71 Fuel Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:34:55 AM
Creation date
2/11/2026 7:52:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
2/17/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Contract to Construct the Fire Station 71 Fuel Station Replacement Project <br />February 17, 2026 <br />Page 3 <br />awarding the construction contract to GEMS Environmental Management Services, Inc. <br />(Exhibit 3). <br />GEMS Environmental Management Services, Inc. has previously performed work as a <br />prime contractor in the City of Santa Ana and successfully completed a project with a <br />similar scope of work at Fire Station No. 74. In addition, GEMS Environmental <br />Management Services, Inc. has completed similar projects for other public agencies, <br />including a diesel tank installation for the East Bay Municipal Utility District and an <br />above -ground storage tank replacement for the City of Pittsburg. Although the firm is <br />based in Northern California, the contractor has confirmed its ability to mobilize <br />resources locally and deploy personnel to Santa Ana for the duration of the project. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes a budget allocation for construction administration, <br />inspection, and testing. Construction administration and inspection may be performed <br />by either Staff or consultants and includes construction management, inspection of the <br />Contractor's work to ensure contract compliance, workmanship, and quality, materials <br />testing, and implementation of the labor requirements. <br />Any of the allocated construction administration funds not spent are considered project <br />savings and are returned to the respective fund balance upon close out of the project. <br />As indicated in the Cost Analysis and as summarized in the table below, the estimated <br />total construction delivery cost of the project is $935,150. <br />Project Item <br />Total <br />Construction Contract Bid Amount <br />$748,120 <br />Construction Administration <br />$59,850 <br />Inspection <br />$37,406 <br />Testing <br />$14,962 <br />Unanticipated or Unforeseen Work <br />$74,812 <br />TOTAL ESTIMATED CONSTRUCTION DELIVERY COST <br />$935,150 <br />Proiect Schedule and Contract Time <br />The project is estimated to be completed in August 2026, barring unforeseeable <br />conditions such as rain, natural disasters, or other delays beyond the control of the City <br />and of the Contractor. The contract time for this project is 80 working days, as specified <br />in the bid documents. Working days are counted in accordance with the City's Standard <br />Specifications, which exclude weekends, City -observed holidays, and inclement <br />weather days that prevent work. <br />The contractor was required to submit a construction schedule as part of their bid to <br />expedite delivery of the project. The projected completion dates based on the submitted <br />
The URL can be used to link to this page
Your browser does not support the video tag.