My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - City Council Work Study Session Regarding the First Street Multimodal Boulevard Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Item 19 - City Council Work Study Session Regarding the First Street Multimodal Boulevard Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:13:33 AM
Creation date
2/11/2026 7:53:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
2/17/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Santa Ana | First Street Multimodal Corridor <br />Technical Memorandum <br /> <br />26 <br /> <br />Community Engagement <br />Community engagement is a key component of identifying barriers to mobility along First <br />Street. Beginning in June 2025 and wrapping up in December 2025, the outreach strategy <br />reached over 900 participants , summarized in Figure 15. <br />In order to achieve balanced input throughout this process, a multi-tiered outreach strategy <br />was conducted, which included: <br />• Broad community outreach <br />through workshops, pop up <br />events and targeted small <br />group meetings. <br />• Stakeholder engagement with <br />both city and government <br />officials as well as active <br />organizations in the <br />community <br />• Community working group <br />meetings with community- <br />based organizations who <br />assisted with driving <br />participation at the community <br />events and bringing <br />awareness to the project. <br />• Presentations to <br />Neighborhood Associations <br />along the corridor. <br />Information at key points in the project was disseminated through workshops and then <br />shared with the community through on-line surveys, pop up events, videos, and <br />presentations at stakeholder, community working group and neighborhood association <br />meetings . The timeline for sharing information about the project is summarized in Figure 16. <br />In this section, the results of Workshop 1 are summarized. Input from the community from <br />Workshop 2 and Workshop 3 are summarized in the Options and Concepts sections of this <br />technical memorandum as the results align with preference surveys and input collected <br />related during those phases of the project. <br />Figure 15: Multi-tiered Outreach Strategy
The URL can be used to link to this page
Your browser does not support the video tag.