My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - City Council Work Study Session Regarding the First Street Multimodal Boulevard Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Item 19 - City Council Work Study Session Regarding the First Street Multimodal Boulevard Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:13:33 AM
Creation date
2/11/2026 7:53:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
2/17/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Santa Ana | First Street Multimodal Corridor <br />Technical Memorandum <br /> <br />27 <br /> <br />Figure 16. Community Engagement Timeline <br /> <br />Workshop 1: Barriers to Mobility <br />The first set of workshops and outreac h events provided an opportunity to introduce the First <br />Street Multimodal Boulevard Study and gather community input on making First Street a <br />healthier and safer experience for all residents who utilize the corridor. <br />The goals of the workshops were to enc ourage participants to connect with the Project <br />Team, share experiences traveling along First Street, suggest improvements to access and <br />travel options, and learn more about the project. <br />To provide multiple opportunities to learn about the project and provide feedback, the Project <br />Team hosted one in-person workshop (Tuesday, August 26, 2025), one virtual workshop <br />(Wednesday, August 27, 2025), conducted an on-line survey, and attended multiple in- <br />person pop-up events in the community. A total of 40 people attended the two workshops <br />and over 60 people were engaged during the Chicano Heritage Festival. Photos 3 through 5 <br />on the following pages illustrate activities at both the pop-up event and at the in-person <br />workshop. <br />Feedback received during the in-person and pop-up events regarding improvements the <br />public would like to see along First Street indicated protected, off street bicycle facilities ; <br />wider sidewalks and mid-block crossings for pedestrians ; improved transit stops with real- <br />time bus inform ation; and shade with places to sit along the corridor were amongst the top <br />priorities for those who participated in the preference survey. Figures 17 to 19 summarize <br />the results of the survey. <br />For the virtual meeting and through the on-line poll, participants were asked to share <br />information about their travel experience and their travel barriers . Results of the on-line <br />surveys are summarized below in Figure 20. <br />
The URL can be used to link to this page
Your browser does not support the video tag.