My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-02-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Agenda Packet_2026-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:28:38 AM
Creation date
2/11/2026 8:25:15 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
2/17/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 23/24CIPCAPITAL IMPROVEMENT PROJECT WORKSHEETPROJECT DESCRIPTION:The proposed improvements would involve the widening of Bristol Street just north of Memory Lane to accommodate an additional through southbound lane. Additionally, the proposed improvements would include the construction of sidewalk, curb and gutter, pavement, signal modification, and curb ramps.PROJECT NEED:Bristol Street north of Memory Lane has three southbound lanes except at the intersection where only two southbound and one right turn lane exist. An additional southbound through lane is needed to complete the City's plan to widen Bristol Street from Warner Avenue to Memory Lane on the north, which was approved by City Council in 1990 and re-evaluated in 2001.PROJECT TITLE:Bristol St & Memory Ln Intersection WideningPROJECT CATEGORY:Street ImprovementsStreet/Bridge Improvements & WideningLOCATION MAPAGENCY: DIVISION: CONTACT:Public Works CIP EngineeringJason Gabriel, Principal Civil EngineerPROJECT COSTSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30Construction489,400------Right-Of-Way-------TOTAL489,400------SOURCE OF FUNDSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30GAS TAX-------MEASURE M2 COMPETITIVE489,400------TSIA AREA F-------TOTAL489,400------16 City Council 14 – 982/17/2026
The URL can be used to link to this page
Your browser does not support the video tag.