My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-02-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
02/17/2026 Regular
>
Agenda Packet_2026-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:28:38 AM
Creation date
2/11/2026 8:25:15 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
2/17/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The proposed improvements would involve the widening of Bristol <br />Street just north of Memory Lane to accommodate an additional <br />through southbound lane. Additionally, the proposed improvements <br />would include the construction of sidewalk, curb and gutter, <br />pavement, signal modification, and curb ramps. <br />PROJECT NEED: <br />Bristol Street north of Memory Lane has three southbound lanes except <br />at the intersection where only two southbound and one right turn lane <br />exist. An additional southbound through lane is needed to complete the <br />City's plan to widen Bristol Street from Warner Avenue to Memory Lane <br />on the north, which was approved by City Council in 1990 and re- <br />evaluated in 2001. <br />PROJECT TITLE: <br />Bristol Street and Memory Lane <br />Intersection Widening <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP <br />AGENCY:CONTACT:DATE: <br />Public Works <br />DIVISION: <br />CIP Engineering Kenny Nguyen, Senior Civil Engineer 07-May-2021 <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />Construction 400,000 ------ <br />TOTAL 400,000 ------ <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />GAS TAX 400,000 ------ <br />TOTAL 400,000 ------ <br />11 <br /> <br /> <br />City Council 14 – 99 2/17/2026
The URL can be used to link to this page
Your browser does not support the video tag.