Laserfiche WebLink
Response • the City of Santa Ana January 28, <br /> 2026 <br /> For Management, Operation, • River View Golf • <br /> AL <br /> Parking Lot Maintenance <br /> • Surface & Structural Care <br /> o Seal cracks and potholes in asphalt or concrete. <br /> o Schedule sealcoating every few years to protect surfaces. <br /> o Paint/repaint lines and markings (spaces, curbs, arrows). <br /> • Lighting& Safety <br /> o Inspect and replace exterior lighting (pole lights, landscape lighting). <br /> o Ensure ADA compliance (ramps, designated spots). <br /> • Cleanliness & Drainage <br /> o Regularly sweep and remove debris. x= <br /> o Check storm drains and clear any blockages. - <br /> o Pressure wash as needed. <br /> Landscaping Maintenance <br /> • Lawn & Plant Care <br /> • Mow grass weekly. <br /> • Prune shrubs and trees. - — <br /> o Weed control and mulching. <br /> o Fertilize and treat for pests/disease. <br /> • Irrigation <br /> o Inspect and adjust sprinkler systems. <br /> o Repair broken heads and ensure efficient coverage. <br /> o Schedule seasonal shutdown/startup if applicable. <br /> • Seasonal Enhancements <br /> o Plant seasonal flowers. Well Maintained Landscaping <br /> o Leaf removal in fall. <br /> Chordonnoy Golf Club <br /> General Maintenance Oversight <br /> • Maintain a detailed maintenance log <br /> • Create a preventive maintenance schedule <br /> • Perform regular inspections (monthly/quarterly) <br /> • Conduct minor renovations as needed <br /> • Budget for routine, emergency, and capital improvements <br /> Timeline for Completing Services <br /> The timeline for completing the services in the Scope of Work will be based upon the ultimate term of this <br /> agreement. If chosen as the successful bidder, the transition timeline will be customized based on the time <br /> available. <br /> CourseCo views the transition period from the incumbent operator to our management as an opportunity to <br /> lay the groundwork for a long and successful relationship. In our 37-year history, CourseCo has always believed <br /> that our relationships with our clients are crucial to the long-term success at the property and each of those <br /> relationships started with a well-planned and executed transition.The transition plan drafted for this project <br /> includes these primary areas: <br /> Plan Elements <br /> • Meet all key staff members and fully understand their roles with the golf operations <br /> • Respond to questions and have numerous discussions <br /> • Set an ongoing meeting schedule(s) that fits the City's needs <br /> • Develop report formats, systems, and protocols in response to City requirements <br /> • Seek suggestions for additional recommended meetings and introductions <br /> CourseCo Team Members <br /> • Michael Sharp <br /> • Tom Bugbee <br /> • Adam Pohl <br /> �_ <br /> �fC�kfiIt ICO 16 — 90 3/3/202&ge 34 <br /> I ' <br />