My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-03-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
03/03/2026 Regular
>
Agenda Packet_2026-03-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 9:30:22 AM
Creation date
2/25/2026 9:18:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
3/3/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
817
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPLEMENTING AGENCY Santa Ana,City of <br /> Local Project Number: Project Title <br /> Additional Project IDs: Bridge Preventative Maintenance(BPMP) <br /> Type of Work: Road Maintenance Project Description <br /> Type of Work Description: Road Maintenance- Eight(8)bridges are eligible for preventative maintenance work under the Bridge Preventative <br /> Bridge Maintenance Program(BPMP)guidelines. <br /> Limits FISCAL TOTAL <br /> FUND TYPE ENG ROW CON/IMP O&M TOTAL <br /> Citywide YEAR ESCALATED <br /> Project Notes 2025 Measure M2 Local $30,000 $0 $0 $0 $30,000 $30,000 <br /> Fairshare <br /> FY 25-26 CIP <br /> 2026 Measure M2 Local $100,000 $0 $0 $0 $100,000 $100,000 <br /> Fairshare <br /> Totals: $130,000 $0 $0 $0 $130,000 $130,000 <br /> Last Revised:25-00-Accepted Total Programmed:$130,000 <br /> TIP ID CP-12511 IMPLEMENTING AGENCY Santa Ana,City of <br /> Local Project Number:25-SNTA-TSP-5013 Project Title <br /> Additional Project IDs: Bristol St Corridor Regional Traffic Signal Synchronization <br /> Type of Work: Traffic Signals Project Description <br /> Type of Work Description: Traffic Signals- To provide inter-agency traffic signal coordination and infrastructure upgrades on Bristol Street from <br /> Interconnect traffic signals to improve coordination SR-22 in the City of Santa Ana through the City of Costa Mesa to Jamboree Road in the City of <br /> and communications Newport Beach. <br /> Limits FISCAL TOTAL <br /> FUND TYPE ENG ROW CON/IMP O&M TOTAL <br /> State Route 22 in the City of Santa Ana to YEAR ESCALATED <br /> Jamboree Road in City of Newport Beach 2026 Traffic Signal Sync $40,000 $0 $3,534,926 $0 $3,574,926 $3,663,299 <br /> Project Notes Program(TSSP) <br /> FY 25-26 CIP <br /> Totals7 $40,000 $0 $3,534,926 $0 $3,574,926 $3,663,299 <br /> Last Revised:25-00-Accepted Total Programmed:$3,574,926 <br /> T` to Ana,Uty or <br /> Local Project Number: 12-SNTA-ACE-3599 Project Title <br /> Additional Project IDs: 12-SNTA-ACE-3599 Bristol St Widening(Washington Ave to 17th St) <br /> Type of Work: Road Widening Project Description <br /> Type of Work Description: Road Widening-Add Bristol Street from Washington Avenue to Seventeenth Street would be widened to a total of six lanes <br /> 2 lanes to existing roadway in project limits (three lanes in each direction)to be consistent with the City of Santa Ana General Plan Circulation <br /> Element and the County of Orange's MPAH. <br /> Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED <br /> Washington Ave to 17th St <br /> Project Notes <br /> Carryforward for active project expenditures Totals: $0 $0 $0 $0 $0 $0 <br /> pending reimbursements or final invoice. <br /> Last Revised:25-00-Accepted Total Programmed:$0 <br /> TIP ID CP--3585 IMPLEMENTING AGENCY Santa Ana,City of <br /> Local Project Number:21-SNTA-ICE-3995 Project Title <br /> Additional Project IDs: Bristol St.and Memory Ln. Intersection Improvements <br /> Type of Work: Intersection Project Description <br /> Type of Work Description: Intersection-Add Widening of the intersection at Bristol Street and Memory Lane.The proposed project would include <br /> through lane(s)to intersection adding a southbound through lane by replacement/installation or curbs,gutters,sidewalk,driveway <br /> approaches,pavement,landscaping,curb ramps,and s <br /> Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED <br /> Bristol St.north of Memory Lane <br /> Project Notes <br /> Totals: $0 $0 $0 $0 $0 $0 <br /> Carryforward for active project expenditures, <br /> pending reimbursements,and/or final invoice. <br /> Last Revised:25-00-Accepted Total Programmed:$0 <br /> City Council 20 — 41 3/3/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.