Laserfiche WebLink
i IMPLEMENTING AGENCY Santa Ana,City of <br /> Local Project Number:24-SNTA-ACE-4064 Project Title <br /> Additional Project IDs: Dyer Road Improvements(55 Freeway-700'E/O Pullman) <br /> Type of Work: Road Widening Project Description <br /> Type of Work Description: Road Widening-Add The project will consist of pavement improvements,curb and gutter,driveways,manholes adjustments, <br /> 2 lanes to existing roadway in project limits wheel chair ramps,sidewalk,additional through lanes eastbound and westbound,bike lanes with a <br /> bike lane buffer,and landscaping <br /> Limits FISCAL TOTAL <br /> Dyer Road from the 55 Freeway to 700'east of <br /> YEAR FUND TYPE EIVG ROW CON/IMP O&M TOTAL ESCALATED <br /> Pullman Street. Arterial Capacity <br /> Project Notes 2025 Enhancements $2,365,200 $0 $0 $0 $2,365,200 $2,365,200 <br /> FY 25-26 CIP (ACE) <br /> 2026 Measure M2 Local $788,400 $0 $0 $0 $788,400 $788,400 <br /> Fairshare <br /> 2027 Other $0 $3,828,042 $0 $0 $3,828,042 $4,021,837 <br /> 2027 Unfunded/Unknown $0 $11,484,125 $0 $0 $11,484,125 $12,065,509 <br /> 2028 Unfunded/Unknown $0 $0 $13,499,993 $0 $13,499,993 $14,538,016 <br /> 2028 Other $0 $0 $4,499,997 $0 $4,499,997 $4,846,005 <br /> Totals: $3,153,600 $15,312,167 $17,999,990 $0 $36,465,757 $38,624,967 <br /> Last Revised:25-00-Accepted Total Programmed:$36,465,757 <br /> Tic in ro-1?03 IMPLEMENTING AGENCY Santa Ana,City of <br /> Local Project Number: Project Title <br /> Additional Project IDs: Fairview Bridge and Street Improvements <br /> Type of Work: Road Widening Project Description <br /> Type of Work Description: Road Widening-Add The proposed improvements would include the widening of Fairview Street with a cross section of 100' <br /> 2 lanes to existing roadway in project limits wide right-of-way and will include 3 lanes in each direction,raised median,Class II bike lane,and 8' <br /> wide sidewalk with tree wells. <br /> Limits FISCAL TOTAL <br /> Fairview Bridge <br /> YEAR FUND TYPE EIVG ROW CON/IMP O&M TOTAL ESCALATED <br /> Project Notes 2025 Measure M2 Local $0 $0 $4,263,263 $0 $4,263,263 $4,263,263 <br /> Fairshare <br /> FY 25-26 CIP;carryforward FY 23-24 amount for <br /> active project expenditures. 2026 Measure M2 Local $350,000 $0 $0 $0 $350,000 $350,000 <br /> Fairshare <br /> Totals: $350,000 $0 $4,263,263 $0 $4,613,263 $4,613,263 <br /> Last Revised:25-00-Accepted Total Programmed:$4,613,263 <br /> TIP ID CP--3616 IMPLEMENTING AGENCY Santa Ana,City of <br /> Local Project Number:22-SNTA-ACE-4020 Project Title <br /> Additional Project IDs: 25-SNTA-ACE-5005 Fairview St. Improvements(Monte Carlo Drive to Trask Street) <br /> Type of Work: Road Widening Project Description <br /> Type of Work Description: Road Widening-Add Widen Fairview Street between Monte Carlo Drive and Trask Avenue from a four-lane roadway to a <br /> 1 lane to existing roadway in project limits six-lane arterial to provide adequate vehicular capacity within the City northern limits. <br /> Limits FISCAL TOTAL <br /> FUND TYPE ENG ROW CON/IMP O&M TOTAL <br /> Monte Carlo to Trask Street YEAR ESCALATED <br /> Project Notes 2026 Arterial CapacityEnhancemnts(ACE) $0 $5,148,290 $0 $0 $5,148,290 $5,276,997 <br /> e <br /> Carryforward for active project expenditures, Measure a Local <br /> pending reimbursements,and/or final invoice. 2026 Fairshare $0 $0 $0 $0 $0 $0 <br /> ROW funded in 2025 Call.Construction phase is <br /> unfunded. 2026 Other $0 $1,716,097 $0 $0 $1,716,097 $1,758,999 <br /> 2027 Unfunded/Unknown $0 $0 $4,441,481 $0 $4,441,481 $4,666,331 <br /> 2027 Other $0 $0 $1,480,494 $0 $1,480,494 $1,555,444 <br /> Totals: $0 $6,864,387 $59921,975$0 $12,786,362 $13,257,771 <br /> Last Revised:25-00-Accepted Total Programmed:$12,786,362 <br /> City Council 20 — 43 3/3/2026 <br />