My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-03-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
03/03/2026 Regular
>
Agenda Packet_2026-03-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 9:30:22 AM
Creation date
2/25/2026 9:18:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
3/3/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
817
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i ita Ana,City of <br /> Local Project Number: Project Title <br /> Additional Project IDs: Fairview Street Corridor Signal Synchronization <br /> Type of Work: Traffic Signals Project Description <br /> Type of Work Description: Traffic Signals- Fairview Street Traffic Signal Synchronization project will coordinate the Traffic Signals along this <br /> Interconnect traffic signals to improve coordination corridor between two agencies. Designated as part of a Signal Synchronization Network Corridor by <br /> and communications the Traffic Signal Synchronization Master Plan <br /> Limits FISCAL TOTAL <br /> Fairview Street from Garden Grove Boulevard to <br /> YEAR FUND TYPE ENG ROW CON/IMP 08M TOTAL ESCALATED <br /> Newport Boulevard 2025 Measure M2 Local $50,000 $0 $200,000 $0 $250,000 $250,000 <br /> Project Notes Fairshare <br /> Carry forward for active project expenditures/final <br /> reimbursement. Totals: $50,000 $0 $200,000 $0 $250,000 $250,000 <br /> Last Revised:25-00-Accepted Total Programmed:$250,000 <br /> TIP ID CP--3584 IMPLEMENTING AGENCY Santa Ana,City of <br /> Local Project Number:21-SNTA-ACE-3996 Project Title <br /> Additional Project IDs: 15-SNTA-ACE-3785 Fairview Street Improvements from 9th St.to 16th St. <br /> Type of Work: Road Widening Project Description <br /> Type of Work Description: Road Widening-Add Widen Fairview Street between 9th Street and 16th Street from a four-lane roadway to a 6-lane arterial <br /> 2 lanes to existing roadway in project limits to provide adequate vehicular capacity within the City's Northern limits. <br /> Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED <br /> 9th St.to 16th St. <br /> Project Notes <br /> Totals: $0 $0 $0 $0 $0 $0 <br /> CARRYFORWARD FOR ACTIVE PROJECT <br /> EXPENDITURES IN FY 25/26 <br /> Last Revised:25-00-Accepted Total Programmed:$0, <br /> CP-11814 ;'r y of <br /> Local Project Number: Project Title <br /> Additional Project IDs: Grand Avenue Rehabilitation from Edinger Avenue to McFadden Avenue <br /> Type of Work: Road Maintenance Project Description <br /> Type of Work Description: Road Maintenance- Reconstruction/resurfacing of existing pavement and replacement/installation of missing or damaged, <br /> Rehabilitation of roadway curbs,gutters,sidewalks,driveway approaches,and wheelchair ramps within this segment of <br /> roadway. <br /> Limits FISCAL TOTAL <br /> FUND TYPE ENG ROW CON/IMP O&M TOTAL <br /> Grand Avenue from Edinger Avenue to McFadden YEAR ESCALATED <br /> Avenue 2025 Measure M2 Local $0 $0 $153,408 $0 $153,408 $153,408 <br /> Project Notes Fairshare <br /> Carryforward for active project expenditures, <br /> pending reimbursements,and/or final invoice. <br /> Totals: $0 $0 $153,408 $0 $153,408 $153,408 <br /> Last Revised:25-00-Accepted Total Programmed:$153,408 <br /> TIP ID CP-12538 IMPI EMENTING AGENCY Santa Ana,City of <br /> Local Project Number: Project Title <br /> Additional Project IDs: Grand Avenue Roadway Rehabilitation from 1 st Street to McFadden Avenue <br /> Type of Work: Road Maintenance Project Description <br /> Type of Work Description: Road Maintenance- Reconstruction/resurfacing of existing pavement and replacement/installation of missing or damaged, <br /> Reconstruction roadway curbs,gutters,sidewalks,driveway approaches,and wheelchair ramps within this segment of <br /> roadway. <br /> Limits FISCAL TOTAL <br /> FUND TYPE ENG ROW CON/IMP O&M TOTAL <br /> Grand Avenue from 1st Street to McFadden YEAR ESCALATED <br /> Avenue 2026 Measure M2 Local $0 $0 $0 $0 $0 $0 <br /> Project Notes Fairshare <br /> Carryforward for active project expenditures, <br /> pending reimbursements,or final invoice.Project Totals: $0 $0 $0 $0 $0 $0 <br /> is currently in the construction phase. <br /> Last Revised:25-00-Accepted Total Programmed:$0 <br /> City Council 20 — 44 3/3/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.