|
CITY OF SANTA ANA Project No,: 21-6978
<br />Date Revised: 06/11/25
<br />Date Reviewed:
<br />COST ESTIMATE
<br />Fairview Street (In the City of Santa Ana) Rehabilitation
<br />South City Limit to Alton Avenue
<br />=
<br />_`
<br />u I?FSL�it P`P>[Ol�i tl
<br />T
<br />,
<br />1
<br />Unclassified Excavation
<br />CX
<br />1,600
<br />$ 384,000,00
<br />2
<br />AC Pavement*
<br />TN
<br />1,200
<br />$ 189,600,00
<br />3
<br />Cold Mill (2")*
<br />SF
<br />240,000
<br />$ 124,800.00
<br />4
<br />Asphalt Rubber Hot Mix (ARHM)*
<br />TN
<br />3,300
<br />$ 557,700,00
<br />5
<br />PCC Sidewalk (4")*
<br />SF
<br />5,900
<br />$ 82,600.00
<br />6
<br />9" Thick PCC Pavement with Dowels
<br />SF
<br />200
<br />$ 4,000,00
<br />7
<br />PCC Driveway Approach (Commercial — 8")*
<br />SF
<br />600
<br />$ 12,000,00
<br />$ 11,600,00
<br />8
<br />PCC Curb Ramp
<br />SF
<br />400
<br />9
<br />PCC Curb and Gutter (Type A-2-8)*
<br />LF
<br />2,000
<br />$ 164,000.00
<br />10
<br />PCC Curb (Type B-1) (Including Steel Rebar`
<br />LF
<br />5,000
<br />$ 200,000,00
<br />$ 130,000.00
<br />11
<br />Colored Concrete - Brick Red, Topeast Exposed
<br />Aggregate Finish (T=4")
<br />SF
<br />5,200
<br />12
<br />PCC Cross -Gutter (Ar(erial Street)
<br />SF
<br />500
<br />$ 14,500.00
<br />13
<br />Concrete Bus Pad
<br />SF
<br />3,100
<br />$ 170,500.00
<br />14
<br />Root Shave*
<br />EA
<br />18
<br />$ 15,500,00
<br />15
<br />Furnish & Install New Water Valve Frame & Cover
<br />to Finished Grade
<br />EA
<br />22
<br />$ 33,000.00
<br />16
<br />Furnish and Install New Water Meter Frame & Cover
<br />and Adjust to Finished Grade
<br />EA
<br />3
<br />$ 3,600.00
<br />17
<br />Adjust Sewer and Drainage Manhole Frame & Cover
<br />to Finished Grade Per C.S.A. STD. 306 Through 308
<br />EA
<br />4
<br />$ 6,000.00
<br />18
<br />Adjust OCSAN Manhole Frame & Ccver to Finished
<br />Grade Per STD. 5-050A, 5-055, and 5-055A
<br />EA
<br />7
<br />$ 14,000.00
<br />19
<br />Furnish & Install New #6 Pallbox to Finished Grade
<br />EA
<br />5
<br />$ 7,500.00
<br />20
<br />Adjust Survey Monument to Finished Grade
<br />EA
<br />2
<br />$ 2,900.00
<br />21
<br />Landscaping & Irrigation
<br />LS
<br />L
<br />$ 432,000.00
<br />22
<br />Construct Parkway Culvert (Type A;
<br />EA
<br />2
<br />$ 18,000.00
<br />23
<br />Install Video Detection System at Fairview Street and
<br />Se erstrom Avenue
<br />LS
<br />1
<br />$ 50,000.00
<br />24
<br />Install Video Detection System at Fairview Street and
<br />Alton Avenue
<br />LS
<br />1
<br />$ 50,000.00
<br />25
<br />Install Video Detection System at Fairview Street and
<br />MacArthur Boulevard
<br />LS
<br />1
<br />$ 50,000.00
<br />$ 6,600.00
<br />26
<br />Furnish & Install Traffic Loops Type E
<br />EA
<br />12
<br />27
<br />Street Furniture
<br />LS
<br />1
<br />$ 85,600.00
<br />28
<br />Project Advertisement Sign
<br />EA
<br />2
<br />$ 4,000.00
<br />29
<br />Signing & Striping
<br />LS
<br />1
<br />$ 198,500.00
<br />30
<br />Construction Permit
<br />LS
<br />1
<br />$ 8,400.00
<br />1(?.
<br />Design Engineering
<br />LA SON $ 90,000.00
<br />Contingency
<br />10% $ 303,000.00
<br />Constriction Engineering
<br />i ! 13A
<br />TQT AL PRQ3Ef „T a ; ...::;
<br />15% $ 455000.00
<br />$i�79yU00 Ot
<br />
|