Laserfiche WebLink
CITY OF SANTA ANA <br />COST ESTIMATE <br />Project No.: 21-6978 <br />Date Revised: 06/11/25 <br />Date Reviewed: <br />Fairview Road (In the City of Costa Mesa) Rehabilitation <br />Sunflower Avenue Intersection haproveinents <br />�� <br />a}RP��+Q��� <br />� � <br />� <br />"^CUTIg <br />+t <br />1 <br />Cold Mill (2") <br />SF <br />9,000 <br />$ 4,680.00 <br />2 <br />Asphalt Rubber Hot Mix (ARHM) <br />TN <br />200 <br />$ 33,800.00 <br />3 <br />1PCC Curb (Type B-1) (Including Steel Rebar) <br />LF <br />265 <br />$ 10,600.00 <br />Colored Concrete - Brick Red, Topcast Exposed <br />4 <br />Aggregate Finish (T=4") <br />SF <br />410 <br />$ 10,300.00 <br />5 <br />Signing acid Striping <br />LS <br />1 <br />$ 15,000.00 <br />} <br />il 1 <br />«a..z.['"g 3, <br />Design Engineering <br />5% $ 4,000.00 <br />Project Administration <br />5% $ 4,000.00 <br />Contingency <br />10% $ 7,000.00 <br />Construction Engineering <br />10% $ 7,000.00 <br />€ tubs}}lr r r' d �a <br />i1�i tfk{7h h �3:Q.ST r i {} t <br />} <br />