My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Public Hearing Ordinance Second Reading - General Plan Amendment, Zoo Overflow Parking Rezone
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
03/17/2026 Regular, Special HA
>
Item 22 - Public Hearing Ordinance Second Reading - General Plan Amendment, Zoo Overflow Parking Rezone
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 8:13:49 AM
Creation date
3/11/2026 9:15:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
22
Date
3/17/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANTA ANA REZONE PROJECT <br />INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />produce waste in excess of capacity of local solid waste infrastructure." As such, development <br />included in the proposed project would not generate solid waste in excess of local solid waste <br />infrastructure and impacts would be less than significant. <br />e) Comply with federal, State, and local management and reduction statutes and <br />regulations related to solid waste? <br />Less than significant impact. The proposed project includes paving of an existing overflow gravel <br />parking lot and associated access roadway. In addition, there would be a separate publicly accessible <br />area in the southern portion of the project site containing a solar panel shade structure above the EV <br />charging stations and associated EV charging stalls. Solid waste may be produced during the <br />construction phase of the proposed project. The proposed project is expected to be serviced by <br />Republic Services. Participation in the City's recycling programs during project construction and <br />operation would ensure that the proposed project would not conflict with federal, State, and local <br />statutes and regulations related to solid waste. Furthermore, the proposed project would meet or <br />exceed standards set forth in CALGreen. As such, impacts would be less than significant. <br />Mitigation Measures <br />None required. <br />8 City of Santa Ana. 2021. Santa Ana General Plan Update Final Recirculated Program Environmental Impact Report. <br />October. Website: https://general-plan-santa-ana-ca.proudcity.com/other-resources/environmental-documents/. Accessed <br />February 26, 2025. <br />FCS 99 <br />Https://adecinnovations.sharepoint.com/sites/PubiicationsSite/Shared Documents/Publications/Client(PN-JN)/D327/03270D47/ISMND/0327D047 Santa Ana Rezone Project ISMND.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.