My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Public Hearing Ordinance Second Reading - General Plan Amendment, Zoo Overflow Parking Rezone
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
03/17/2026 Regular, Special HA
>
Item 22 - Public Hearing Ordinance Second Reading - General Plan Amendment, Zoo Overflow Parking Rezone
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 8:13:49 AM
Creation date
3/11/2026 9:15:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
22
Date
3/17/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANTA ANA REZONE PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Table 1: Santa Ana Rezone Project Mitigation Monitoring and Reporting Program <br />Timing of Responsible for <br />Mitigation Measures <br />Method of Verification <br />Verification Verification <br />2.4 Biological Resources <br />MM BIO-la: Nesting Bird Pre -construction Surveys. If <br />Project applicant or <br />Prior to ground- City of Santa Ana <br />ground -disturbing or vegetation -removing construction <br />contractor shall submit <br />disturbing or Planning and <br />activities or tree removal is proposed during the <br />the biologist's resume or <br />vegetation -removing Building Agency <br />breeding/nesting season for migratory birds (typically February <br />curriculum vitae (CV) <br />construction <br />1 through September 15), a qualified Biologist shall conduct <br />demonstrating relevant <br />pre -construction surveys for special -status birds and other <br />education, certifications, <br />migratory birds within the construction area, including a 300- <br />and field experience to <br />foot survey buffer, no more than 3 days prior to the start of <br />the City; project applicant <br />ground -disturbing activities in the construction area <br />shall also submit a copy <br />of executed contract with <br />the biologist, showing <br />scope of work and <br />timeline to City <br />Confirm pre -construction Prior to ground- City of Santa Ana <br />surveys for nesting birds disturbing or Planning and <br />were conducted vegetation -removing Building Agency <br />construction <br />MM BIO-1b Avoidance of Active Avian Nests <br />Confirm the United <br />During pre- City of Santa Ana <br />If an active nest is located during pre -construction surveys or <br />States Fish and Wildlife <br />construction Planning and <br />at any point during the construction phase of the proposed <br />Service and/or California <br />surveys; during Building Agency <br />project, the United States Fish and Wildlife Service (USFWS) <br />Department of Fish and <br />construction <br />and/or California Department of Fish and Wildlife (CDFW) (as <br />Wildlife have been <br />appropriate) shall be notified regarding the status of the nest. <br />notified <br />Furthermore, construction activities shall be restricted as <br />Verification of Completion <br />Date Initial <br />FCS 3 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client(PN-JN)/0327/03270047/MMRP/03270047 Santa Ana Rezone Project MMRP.docx <br />