Laserfiche WebLink
SANTA ANA REZONE PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Mitigation Measures <br />Method of Verification <br />necessary to avoid disturbance of the nest until it is Verify that construction <br />abandoned, or a qualified Biologist deems disturbance activities have been <br />potential to be minimal. Restrictions may include establishment restricted or a qualified <br />of exclusion zones (no ingress of personnel or equipment at a biologist has deemed <br />minimum radius of 300 feet around an active raptor nest and a potential disturbance to <br />50-foot radius around an active migratory bird nest) or be minimal <br />alteration of the construction schedule <br />2.5 Cultural Resources and Tribal Cultural <br />Timing of <br />Verification <br />Responsible for <br />Verification <br />MM CUL-1: Prior to the initiation of construction activities, all <br />Submit evidence to City Prior to the initiation City of Santa Ana <br />construction personnel conducting ground disturbance at the <br />that a WEAP training has of construction Planning and <br />site shall be provided Worker Environmental Awareness <br />been conducted by an activities; Building Agency; <br />Program (WEAP) cultural resources "tailgate" training. The <br />Archaeologist who meets <br />training shall include visual aids, a discussion of applicable <br />the Secretary of the <br />laws and statutes relating to archaeological resources, types of <br />Interior's Professional <br />resources that may be found within the project site, and <br />Qualification Standards <br />procedures to be followed in the event such resources are <br />for archaeology <br />encountered. The training shall be conducted by an <br />Archaeologist who meets the Secretary of the Interior's <br />Professional Qualification Standards for archaeology. <br />In the event that buried archaeological resources are <br />Document that During construction; City of Santa Ana <br />discovered during construction, operations shall stop within a <br />operations have stopped Upon discovery of Planning and <br />100-foot radius of the find and an Archaeologist who meets the <br />in daily construction logs; resources; Building Agency; <br />Secretary of Interior's Professional Qualification Standards for <br />Project applicant or <br />archaeology shall be consulted to determine whether the <br />contractor shall submit <br />resource requires further study. The qualified Archaeologist <br />the qualified <br />shall make recommendations to the Lead Agency on the <br />Archaeologist's resume <br />measures that shall be implemented to protect the discovered <br />or curriculum vitae (CV) <br />resources, including but not limited to excavation of the finds <br />demonstrating relevant <br />Verification of Completion <br />Date Initial <br />FCS 4 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client(PN-JN)/0327/03270047/MMRP/03270047 Santa Ana Rezone Project MMRP.docx <br />