My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Public Hearing Ordinance Second Reading - General Plan Amendment, Zoo Overflow Parking Rezone
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
03/17/2026 Regular, Special HA
>
Item 22 - Public Hearing Ordinance Second Reading - General Plan Amendment, Zoo Overflow Parking Rezone
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 8:13:49 AM
Creation date
3/11/2026 9:15:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
22
Date
3/17/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANTA ANA REZONE PROJECT <br />INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />Environmental Issues <br />2.10 Hydrology and Water Quality <br />Would the project: <br />a) Violate any water quality standards or <br />waste discharge requirements or otherwise <br />substantially degrade surface or <br />groundwater quality? <br />b) Substantially decrease groundwater <br />supplies or interfere substantially with <br />groundwater recharge such that the project <br />may impede sustainable groundwater <br />management of the basin? <br />c) Substantially alter the existing drainage <br />pattern of the site or area, including <br />through the alteration of the course of a <br />stream or river or through the addition of <br />impervious surfaces, in a manner which <br />would: <br />(i) result in substantial erosion or siltation <br />on- or off -site; <br />(ii) substantially increase the rate or <br />amount of surface runoff in a manner <br />which would result in flooding on- or off - <br />site; <br />(iii)create or contribute runoff water which <br />would exceed the capacity of existing or <br />planned stormwater drainage systems <br />or provide substantial additional <br />sources of polluted runoff; or <br />(iv) impede or redirect flood flows? <br />d) In flood hazard, tsunami, or seiche zones, <br />risk release of pollutants due to project <br />inundation? <br />Less than <br />Significant <br />Potentially Impact with Less than <br />Significant Mitigation Significant <br />Impact Incorporated Impact No Impact <br />❑ ❑ ® ❑ <br />❑ ❑ ® ❑ <br />❑ ❑ ® ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />® <br />❑ <br />❑ ❑ ® ❑ <br />❑ ❑ ❑ <br />❑ ❑ ❑ <br />FCS 65 <br />Https://adecinnovations.sharepoint.com/sites/PubiicationsSite/Shared Documents/Publications/Client(PN-JN)/D327/03270D47/ISMND/0327D047 Santa Ana Rezone Project ISMND.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.