Laserfiche WebLink
(9) <br />CITY OF SANTA ANA <br />EXHIBIT I <br />SCOPE OF SERVICES <br />Contractor shall perform services as set forth below. <br />The City is seeking a qualified firm that has expertise and experience in designing, providing, installing, maintaining, <br />and monitoring security camera systems. The City is particularly interested in a firm that has experience in assisting <br />municipalities or similar large commercial customers with any technical issues that may arise. Contractor shall <br />perform dur€ng the term of this Agreement, the tasks and obligations including all labor, materials, tools, equipment, <br />and incidental customary work required to fully and adequately complete the installation, monitoring, and <br />maintenance of security cameras at the Zoo and ECO Center. There are two installation/new equipment parts to <br />this project: <br />1) Enhancement of access control at the Santa Ana Zoo, and <br />2) Installation of a new camera system at the Santiago Park ECO Center. <br />In addition to supplying and installing system enhancements at the Zoo, and supplying/installing the new system at <br />ECO Center, the firm must provide both facilities with a multi -year monitoring and maintenance contract. The zoo's <br />existing video surveillance system is capable of capturing and recording images day and night Said images provide <br />the details needed for the successful prosecution of security investigations In addition to post -event investigations <br />and forensics, the video surveillance system is used for live remote monitoring and audio communication; live <br />monitoring takes place mostly after-hours. The new system installed at ECO Center, and additional components <br />installed at zoo, must meet these standards. <br />CONSTRUCTION METHODS <br />During installation, work must be performed by Contractor between the hours of 7:00am-5:00pm, Monday — Friday. <br />Contractor is responsible for running power from existing sources to camera or speaker locations as needed. <br />Contractor is responsible for ensuring guest safety during installation. Zoo and ECO Center staff and visitors can <br />be directed away from the immediate work area with caution tape or temporary barricades. Contractor is responsible <br />for meeting industry best practices to ensure installation is safe. <br />I••JO <br />A. Provide and install 2N IP Force intercom (or approved equal, please refer to Section XII. General Terms and <br />Conditions, letter A. Alternatives) at perimeter gate https://www.2n.comlen-US/products/intercoms/2n-ip4orce/ <br />B. Provide and install 2N Indoor View (or approved equal, please refer to Section XII. General Terms and <br />Conditions, letter A. Alternatives) for connectivity to the perimeter gate https://www.2n.com/en- <br />USlproducts/indoor-stationsl2n-indoor-view/ <br />C. Provide necessary equipment to install and link these devices for proper functioning <br />D. Install one Dell UltraSharp 43 4K USB-C Hub Monitor - U4323QE (or approved equal. please refer to Section <br />XII General Terms and Conditions, letter A. Alternatives) in the zoo office and set the display up to show a <br />constant CCTV feed of the cameras being monitored at the zoo <br />E. Include 10% contingency for replacement of equipment as it ages over the course of the contract. <br />F Maintain equipment as follows: <br />1. Service Provider will test - at least once per day - all equipment (cameras, speakers and related gear) <br />needed for providing the remote live video monitoring service; a remote test will satisfy this requirement. <br />When a failure or performance degradation is detected, Service Provider will inform the Santa Ana Zoo <br />within two hours of discovering the problem; a service visit will take place within 24 hours of detecting <br />a problem and said problem will be repaired within 72 hours of its detection. This type of repair time will <br />require that Service Provider keep an inventory of replacement cameras and parts. <br />2. Training for City staff on the use of the video surveillance system is considered an integral part of the <br />maintenance services. When video surveillance system is first installed, Service Provider will conduct <br />training for City staff (not to exceed 1 hour). After this first training session related to initial system <br />City of Santa Ana RFP No. 25-082 Page 20 of 40 <br />