My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Select Locally Preferred Alternative for the First Street Multimodal Boulevard Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 12 - Select Locally Preferred Alternative for the First Street Multimodal Boulevard Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:36 AM
Creation date
4/29/2026 11:38:58 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
12
Date
5/5/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMUNITYOUTREACH <br /> COMMUNITY-BASED ORGANIZATION WORKING GROUP <br /> The team organized a Community Working Group (CWG) comprising local grassroots CBOs <br /> to build strong relationships with key populations along the corridor. The CBOs that <br /> participated are: <br /> • Latino Health Access <br /> • Orange County Communities Organized for Responsible Development <br /> • Orange County Environmental Justice <br /> • Santa Ana Active Streets <br /> • The Bicycle Tree <br /> These organizations hosted engagement efforts and shared educational materials and event <br /> information through their channels, as demonstrated in Figure 12 and Figure 13. <br /> Additionally, CWGs reviewed and provided culturally competent, linguistically inclusive <br /> feedback on educational and communication materials. <br /> Hello, this is OCCORD!The City of <br /> Santa Ana wants your input on <br /> how to make First Street safer& <br /> more accessible �, <br /> Watch the videos of the 8 design <br /> options&vote for your top 3 by <br /> Oct 10! <br /> M Videos: <br /> English w/Vietnamese subs: <br /> www.youtube.com/watch? <br /> v=IkLLAspZVdc <br /> Espanol:www.y_qutube.com/ <br /> watch?v=ZW8d0050KoY <br /> Poll: <br /> English:hdr.iotform.com/team/ <br /> public/first-street-survey <br /> Espanol:hdr.jotform.com/team/ <br /> public/f irst-street-survey-sspanish <br /> Tigng Vitt:hdr.jotform.com/team/ <br /> public/first-street-survey_ <br /> vietnamese <br /> Figure 12: Short Message Service(SMS)sent by OCCORD <br /> advertising the multilingual videos and the design option poll. <br /> First Street Multimodal Boulevard Study— 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.