Laserfiche WebLink
COMMUNITYOUTREACH <br /> COMMUNITY WORKSHOPS <br /> Community input was central to this Study. The series of workshops provided an opportunity <br /> to introduce the Study and gather community input on making First Street a healthier and <br /> safer corridor for all residents who use it. The in-person workshops were held at the <br /> Roosevelt-Walker Community Center, located under a quarter-mile south of First Street and <br /> Standard Avenue, providing convenient access for nearby residents (Figure 14). <br /> The goal was to provide multiple in-person and virtual opportunities for participants to <br /> connect with the team, learn about the Study, share experiences traveling along First Street, <br /> and suggest improvements to access and travel options. The workshops were conducted in <br /> multiple phases, each serving a specific purpose in the proposed project development <br /> process. Additional pictures of the workshops and comments are provided in APPENDIX A: <br /> Community Workshop Series. <br /> CIVIC CENTER DR � 5 <br /> 0 <br /> SANTA ANA BLVD O <br /> m <br /> JST ST JST ST <br /> m CHESTNUT AVE <br /> Z - <br /> cj Q <br /> O <br /> q_ J <br /> LC ' - <br /> MC FADDEN AV Q <br /> Q <br /> o UJ <br /> Z Q <br /> co Q <br /> EDINGER AV m O N z <br /> of <br /> m VI <br /> = Roosevelt-Walker Community Center <br /> = Study Area <br /> Figure 14: Map of the Roosevelt-Walker Community Center and its proximity to the Study area. <br /> I� <br /> First Street Multimodal Boulevard Study— 19 <br />