Laserfiche WebLink
EXHIBIT 2 <br /> City of Santa Ana 9/15/2014 <br /> Santa Ana Boulevard Grade Separation Project <br /> Preliminary Engineering Estimate <br /> No. Item Description Unit of Unit Cost Quantity Item Total <br /> Measure <br /> Engineering: <br /> 29 Final PS&E Design(10%) LS $ 4,500,875 1 $ 4,500,875 <br /> 30 Construction Engineering(15%) LS $ 6,751,313 1 $ 6,751,313 <br /> Engineering Total: $ 11,252,188 <br /> Right of Way: <br /> 31 Right of Way Acquisition LS $ 12,460,486 1 $ 12,460,486 <br /> Subtotal: $ 12,460,486 <br /> 25%Contingency: $ 3,115,122 <br /> Right of Way Total: $ 15,575,608 <br /> 32 Right of Way Consultant Support LS $ 1,500,000 1 $ 1,500,000 <br /> Total Project Cost(not including PA/ED): $ 73,336,546 <br /> 2 <br />