My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 1:39:30 PM
Creation date
4/30/2026 8:07:46 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
22
Date
5/5/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual EXHIBIN%ibit 6-A <br /> Preliminary Environmental Study(PES)Form <br /> Exhibit 6-A Preliminary Environmental Study (PES)Form <br /> Federal Project No.: STPL 5063(136) Final Design: December 2012 <br /> (Federal Program Prefix-Project No.,Agreement No_) (Expected Start Date) <br /> To: Jim Kaufman,Chief,Office of Local Programs From: City of Santa Ana <br /> (District Local Assistance Engineer) (Local Agency) <br /> District 12 Jason Gabriel—(714)647-5664 <br /> (District) (Project Manager's Name and Telephone No.) <br /> 3347 Michelson Dr., Suite 100 20 Civic Center Plaza,M-36 <br /> Irvine,California 92612-8894 Santa Ana, California 92701 <br /> (Address) (Address) <br /> Jim.Kaufman@dot.ca.gov JGabriel@santa-ana.org <br /> (E-mail Address) (E-mail Address) <br /> Is this Project"ON"the ❑ Yes IF YES,STOP HERE and contact the District Local Assistance Engineer <br /> State Highway System? ® No regarding the completion of other environmental documentation. <br /> Federal State Transportation Improvement Program 2011 21 <br /> (FSTIP)http://www.dot.ca.gov/hq/transprog/fedpgm.htm: (Currently Adopted Plan Date) (Page No. attach to this forne) <br /> Programming Preliminary Engineering Right of Way Construction <br /> for FSTIP: Prior $ 1.5M N/A $ N/A N/A $ N/A <br /> (Fiscal Year) (Dollars) (Fiscal Year) (Dollars) (Fiscal Year) (Dollars) <br /> Project Description as Shown in RTP and FSTIP: FTIP No.ORA082610: Santa Ana Blvd Grade Separation-Near the <br /> Expansion of the Santa Ana Regional Transportation Center(SARTIC). Initial planning and conceptual engineering phase.Related to <br /> ORA81621. <br /> Detailed Project Description: (Describe the following,as applicable:purpose and need,project location and limits,required right of way <br /> acquisition,proposedfacilities,staging areas,disposal and borrow sites,construction activities,and construction access.) <br /> Project Name: Santa Ana Boulevard Grade Separation Project. The City of Santa Ana,in coordination with the California <br /> Department of Transportation(Department),is proposing to grade separate the existing Santa Ana Boulevard/Orange County <br /> Transportation Authority(OCTA)Metrolink at-grade railroad crossing in the City of Santa Ana,Orange County,California. The <br /> purpose of the proposed project is to improve safety,as it will remove the existing at-grade conflict between vehicular traffic and rail <br /> traffic. In addition,the proposed project would reduce the congestion and inconvenience caused by this existing at-grade facility. See <br /> page 1 for complete.Project Description. <br /> (Continue description on "Notes"sheet,last page of this Exhibit,iif necessary) <br /> Preliminary Design Information: <br /> Does the project involve any of the following? Please check the appropriate boxes and delineate on an attached map,plan, <br /> or layout including any additional pertinent information. <br /> Yes No Yes No Yes No <br /> ® ❑ Widen existing roadway ® ❑ Ground disturbance ® ❑ Easements <br /> ❑ ® Increase number of through lanes ® ❑ Road cut/fill ® ❑ Equipment staging <br /> ❑ ® New alignment ® ❑ Excavation: anticipated ® ❑ Temporary access road/detour <br /> ❑ ® Capacity increasing—other maximum depth 25 feet ® ❑ Utility relocation <br /> (e.g.,channelization) ® ❑ Right of way acquisition <br /> ® ❑ Drainage/culverts (if yes,attach map with APN) <br /> ® ❑ Realignment ❑ ® Flooding protection <br /> ❑ ® Ramp or street closure ❑ ® Stream channel work ® ❑ Disposal/borrow sites <br /> ® ❑ Bridge work <br /> ® ❑ Pile driving ❑ ® Part of larger adjacent project <br /> ® ❑ Vegetation removal <br /> ® ❑ Tree removal ® ❑ Demolition ® ❑ Railroad <br /> Required Attachments: <br /> ®Regional map ®Project location map ®Project footprint map(existing/proposed right of way) <br /> ❑ Engineering drawings(existing and proposed cross sections),if available ❑ Borrow/disposal site location map,if applicable <br /> (Note:all maps(except project location map and regional maps)should be consistent with the project description(minimum scale:1"=200).) <br /> ®Notes to support the conclusions of this checklist/project description continuation page(attached) <br /> Page 6-69 <br /> LPP 08-02 May 30,2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.