My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 1:39:30 PM
Creation date
4/30/2026 8:07:46 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
22
Date
5/5/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 6-A Local Assistance BhTa Manual <br /> Preliminary Environmental Study(PES)Form <br /> Examine the project for potential effects on the environment,direct or indirect and answer the following questions. <br /> The"construction area,"as specified below,includes all areas of ground disturbance associated with the project, <br /> including staging and stockpiling areas and temporary access roads. <br /> Each answer must be briefly documented on the"Notes"pages at the end of the PES Form. <br /> A. Potential Environmental Effects Yes To Be No <br /> Determined <br /> General <br /> I. Will the project require future construction to fully utilize the design capabilities included in the ❑ ❑ <br /> proposed project? <br /> 2. Will the project generate public controversy? ❑ ❑ <br /> Noise <br /> 3. Is the project a Type I project as defined in 23 CFR 772.5(h);"construction on new location or the ® ❑ ❑ <br /> physical alteration of an existing highway,which significantly changes either the horizontal or <br /> vertical alignment or increases the number of through-traffic lanes"? <br /> 4. Does the project have the potential for adverse construction-related noise impact ❑ ® ❑ <br /> (such as related to pile driving)? <br /> Air Quality <br /> 5. Is the project in a NAAQS non-attainment or maintenance area? ® ❑ ❑ <br /> 6. Is the project exempt from the requirement that a conformity determination be made?(If"Yes,"state ® ❑ ❑ <br /> which conformity exemption in 40 CFR 93.126,Table 2 applies):railroad/highway crossing <br /> 7. Is the project exempt from regional conformity? (If"Yes,"state which conformity exemption in 40 ❑ ❑ ❑ <br /> CFR 93.127,Table 3 applies): <br /> 8. If project is not exempt from regional conformity,(If"No"on Question#7) <br /> Is project in a metropolitan non-attainment/maintenance area? ❑ ❑ ❑ <br /> Is project in an isolated rural non-attainment area? ❑ ❑ ❑ <br /> Is project in a CO,PM10 and/or PM2.5 non-attainment/maintenance area? ❑ ❑ ❑ <br /> Hazardous Materials/Hazardous Waste <br /> 9. Is there potential for hazardous materials(including underground or aboveground tanks,etc.)and/or ❑ ® ❑ <br /> hazardous waste(including oil/water separators,waste oil,asbestos-containing material,lead-based <br /> paint,ADL,etc.)within or immediately adjacent to the construction area? <br /> Water Quality/Resources <br /> 10. Does the project have the potential to impact water resources(rivers,streams,bays,inlets,lakes, ❑ ® ❑ <br /> drainage sloughs)within or immediately adjacent to the project area? <br /> 11. Is the project within a designated sole-source aquifer? ❑ ❑ <br /> Coastal Zone <br /> 12. Is the project within the State Coastal Zone,San Francisco Bay,or Suisun Marsh? ❑ ❑ <br /> Floodplain <br /> 13. Is the construction area located within a regulatory floodway or within the base floodplain(100-year) ❑ ❑ <br /> elevation of a watercourse or lake? <br /> Wild and Scenic Rivers <br /> 14. Is the project within or immediately adjacent to a Wild and Scenic River System? ❑ ❑ <br /> Biological Resources <br /> 15. Is there a potential for federally listed threatened or endangered species,or their critical habitat or ❑ ® ❑ <br /> essential fish habitat to occur within or adjacent to the construction area? <br /> 16. Does the project have the potential to directly or indirectly affect migratory birds,or their nests or ❑ ® ❑ <br /> eggs(such as vegetation removal,box culvert replacement/repair,bridge work,etc.)? <br /> 17. Is there a potential for wetlands to occur within or adjacent to the construction area? ❑ ❑ <br /> Page 6-70 <br /> May 30,2008 LPP 08-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.