My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 1:39:30 PM
Creation date
4/30/2026 8:07:46 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
22
Date
5/5/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br /> iii. Prepare supplementary sketches and details as required to resolve field <br /> construction problems that may be encountered, <br /> iv. Review and provide recommendations regarding proposed change orders, as <br /> needed. <br /> b. Preparation of Record Documents (As-Builts) <br /> The construction contract shall require the contractor to provide to the City for review <br /> and approval one set of as-built plans showing the design changes made during the <br /> course of construction. Consultant shall prepare record drawings from contractor and <br /> construction inspector as-built drawing, markups, and field notes. Submit the <br /> following: <br /> i. One (1) electronic submittal with the record drawing files saved in AutoCAD <br /> 2022 .DWG or MicroStation Connect .DGN and .PDF formats. <br /> 14. OPTIONAL SERVICES <br /> Consultant shall provide separate line items in the cost proposal for the "Optional <br /> Services". City may exclude or include the optional services as part of the awarded contract <br /> at City's discretion. The "Optional Services" shall include the following activities: <br /> a. Construction Staring <br /> b. Other optional service as determined by Consultant <br />
The URL can be used to link to this page
Your browser does not support the video tag.