Laserfiche WebLink
First Street Multimodal Boulevard Study <br /> February 17, 2026 <br /> Page 7 <br /> CONCEPT OVERVIEW <br /> Fact sheets for each concept are provided in Exhibits 4, 5, and 6. <br /> Option I. Multi-Use Path Concept <br /> • Maintains six vehicular travel lanes-, <br /> • Introduces shared pedestrian/bicycle path on the south side at the sidewalk level-, <br /> • Sidewalk on the north side-, <br /> • Maintains existing vehicle capacity but includes shared spaces. <br /> Conceptual View Looking east an First St near Shelton St <br /> C2 <br /> G C? "7 <br /> �? -P <br /> .L .L TT T <br /> 101 76' 14' <br /> ,`iilr•mr.ilk Roadway Shared Podest"'.. <br /> 9cycle Path <br /> 100' First St Right-of-way <br /> rt� . <br /> Y <br /> k- G <br /> 1 <br /> City Council 12 — 80 5/5/2026 <br />