My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-05-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Agenda Packet_2026-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 9:47:48 AM
Creation date
4/30/2026 2:01:27 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
First Street Multimodal Boulevard Study <br /> February 17, 2026 <br /> Page 7 <br /> CONCEPT OVERVIEW <br /> Fact sheets for each concept are provided in Exhibits 4, 5, and 6. <br /> Option I. Multi-Use Path Concept <br /> • Maintains six vehicular travel lanes-, <br /> • Introduces shared pedestrian/bicycle path on the south side at the sidewalk level-, <br /> • Sidewalk on the north side-, <br /> • Maintains existing vehicle capacity but includes shared spaces. <br /> Conceptual View Looking east an First St near Shelton St <br /> C2 <br /> G C? "7 <br /> �? -P <br /> .L .L TT T <br /> 101 76' 14' <br /> ,`iilr•mr.ilk Roadway Shared Podest"'.. <br /> 9cycle Path <br /> 100' First St Right-of-way <br /> rt� . <br /> Y <br /> k- G <br /> 1 <br /> City Council 12 — 80 5/5/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.