My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-05-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Agenda Packet_2026-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 9:47:48 AM
Creation date
4/30/2026 2:01:27 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
First Street Multimodal Boulevard Study <br /> February 17, 2026 <br /> Page 9 <br /> Option 3: Bus Lanes and Bikeway Concept <br /> • Four general-purpose lanes plus dedicated transit-only bus lanes-, <br /> • Protected bicycle facilities on both sides-, <br /> • Significant transit performance benefits-, <br /> • Greatest potential mode shift but highest traffic operational tradeoffs. <br /> r� <br /> Q <br /> ' -azz:*' <br /> 1 ' ' ROBy i,,1.?,`� mnm`arcial! <br /> Parking <br /> fW iFirst St Right-of-+way <br /> s <br /> d �y <br /> �r <br /> �y I <br /> 1 <br /> - I <br /> Concepts East of Zoo Lane <br /> For the eastern segment (1-5 to Tustin Avenue), a consistent four-lane configuration to <br /> match the existing cross-section of First Street within City of Tustin limits with expanded <br /> pedestrian and bicycle zones is proposed across all alternatives, building on a planned <br /> City Council 12 — 82 5/5/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.