My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Public Hearing - Resolutions Approving the 2025 Urban Water Management Plan and the 2025 Water Shortage Contingency Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/19/2026 Regular, Special HA
>
Item 21 - Public Hearing - Resolutions Approving the 2025 Urban Water Management Plan and the 2025 Water Shortage Contingency Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 11:52:37 AM
Creation date
5/13/2026 11:50:25 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
21
Date
5/19/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 URBAN WATER MANAGEMENT PLAN <br /> MAY 2026/FINAL DRAFT/CAROLLO <br /> Table 2.2 Submittal Table 2-2: Plan Identification <br /> Submittal Table 2-2: Plan Identification <br /> Select Name of Regional Alliance or RUWMP <br /> One or Type of Plan <br /> Both (Drop Down List) <br /> ❑ Individual UWMP <br /> If Water Supplier is also a member of a SB X7-7 Orange County 20x2020 Regional Alliance <br /> Regional Alliance,select name from the drop-down. <br /> ❑ Regional Urban Water Management Plan RUWMP <br /> If Supplier selected RUWMP,select name from the <br /> drop-down. <br /> Table 2.3 Submittal Table 2-3: Supplier Identification <br /> SupplierSubmittal Table 2-3: <br /> Type of Supplier(select one or both) <br /> ❑ Supplier is a wholesale supplier <br /> ❑ Supplier is a retail supplier <br /> Fiscal or •. • <br /> ❑ UWMP Tables are in calendar years <br /> ❑ UWMP Tables are in fiscal years <br /> If using fiscal years provide month and date that the fiscal year begins(mm/dd) <br /> 711 <br /> • • I ••Amp <br /> Unit AF <br /> DWR NOTES: Units of measure(AF,CCF, MG)must remain consistent throughout the UWMP as reported in Submittal <br /> Table 2-3. <br /> 2.2 Coordination and Outreach <br /> 2.2.1 Integration With Other Planning Efforts <br /> The City, as a retail water supplier, coordinated this UWMP preparation effort with other key entities, <br /> including MET, regional wholesaler for Southern California and the direct supplier of imported water to <br /> the City and MWDOC; MWDOC, regional wholesale supplier for most of Orange County; and the Orange <br /> County Water District (OCWD) as the manager of the Orange County Groundwater Basin (OC Basin). While <br /> the City is not a member agency of MWDOC, the City developed this Plan in conjunction with other <br /> regionally consistent efforts such as population projections from the Center for Demographic Research at <br /> California State University, Fullerton (CDR), and the Orange County Water Deland Projection Model <br /> Technical Memorandum. <br /> CITY OF SANTA ANA <br />
The URL can be used to link to this page
Your browser does not support the video tag.