Laserfiche WebLink
EXHIBIT 4 <br /> SCHEDULE G <br /> RAISE PERFORMANCE MEASUREMENT INFORMATION <br /> Study Area: The project study area is on Santa Ana Boulevard between the Santiago Street <br /> intersection and the Interstate 5 southbound on- and off-ramp intersection, a total distance of <br /> approximately 1,500 linear feet. <br /> Baseline Measurement Date: July 31, 2027 <br /> Baseline Report Date: September 30, 2027 <br /> Table 1: Performance Measure Table <br /> Performance Measure Unit Reported <br /> Travel Time Average Travel Time (Minutes)per Trip <br /> Greenhouse Gas Emissions Total Carbon Dioxide Emissions (metric tons)per Year <br /> 9of14 <br />