Laserfiche WebLink
SCOPE OF SERVICES CITY OFSANTAANA tAA <br /> SANTA ANA BOULEVARD GRADE SEPARATION 0 <br /> HARK THOHAS <br /> Task 1 Project Administration 1.3 Project Meetings <br /> Mark Thomas will lead Project Development Team <br /> 1.1 Project Management&Administration (PDT) meetings throughout the Environmental, <br /> Mark Thomas will be responsible for the daily Right of Way, and Plans/Specifications/Estimate <br /> management and administration of the project, (PSE) phases of the Project. PDT meetings will <br /> including subconsultants. include representatives from the City and other <br /> stakeholders as appropriate and as requested by <br /> 1.2 Project Management Plan (PMP)IQualty the City. This task includes preparation of <br /> Management Plan (QMP) agendas, meeting minutes within seven (7) days of <br /> This task will include the preparation of a Project- the meeting date, log of action items, data request <br /> specific Project Management Plan (PMP) to the log, and design decision log. Current copies of the <br /> City for review and concurrence within one month Baseline Schedule, Deliverables List and Risk <br /> of receiving Notice to Proceed and will be reviewed Register will be distributed and reviewed during <br /> at the first PDT meeting. At a minimum, the PMP PDT meetings. Assumed number of meetings is <br /> will include: twenty-four (24). <br /> r <br /> The final scope of services 1.4 Progress Reporting <br /> • Communication plan between Mark Mark Thomas will prepare monthly invoices for the <br /> Thomas, City and other third-party Project by task number and milestone. This will <br /> stakeholders. include direct labor, other direct costs, and sub- <br /> • Deliverables List consistent with the scope consultant costs. These will include progress <br /> of services including dates submitted by reports in accordance with the City guidelines <br /> Mark Thomas and approved by the City (or corresponding to task number and milestones. <br /> approving agency). Updated schedule will be included with the monthly <br /> • Baseline Schedule using Microsoft Project progress reports. <br /> and in a Critical Path Method (CPM) 1.6 Schedule <br /> format. <br /> • CADD Procedures consistent with the City A detailed baseline schedule will be prepared in <br /> CADD Users Manual MS Project for the design phase of the project for <br /> • Approved Invoicing Instructions. City review and approval. The schedule will be <br /> • List of Applicable Design Standards and updated on a monthly basis. <br /> Guidelines to be utilized in the project. 1.6 Risk Assessment <br /> • General Prevailing Wage Determinations Risk Register identifying risk, quantifying time and <br /> for applicable classifications and services. cost impacts, risk owner, risk mitigation plan, due <br /> Mark Thomas will prepare, implement and and completion dates for risk mitigation <br /> maintain a Project-specific Quality Management Task 1 Deliverables: <br /> System (QMS) Manual throughout the services for <br /> this scope of work. The QMS Manual will be Draft and Final PMP & QMP <br /> updated as necessary to include additional Meeting Agendas, Minutes & Exhibits <br /> measures and processes throughout the life of the • Progress Reports <br /> project to minimize or eliminate errors and • Baseline Schedule and Monthly Updates <br /> omissions. Mark Thomas will submit the Project- • Risk Matrix <br /> specific QMS Manual for review and concurrence Task 1 Assumptions: <br /> within one month of receiving Notice to Proceed. <br /> Training will be provided„ as necessary, with Mark The basis for the scope of services is a 24 <br /> Thomas staff and sub-consultants staff responsible month period for the final design, excluding <br /> for implementing the QMS Manual. bid and construction support. <br />