My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC. (6)
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 8:22:25 AM
Creation date
5/27/2026 8:21:03 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2026-063
Agency
Public Works
Council Approval Date
5/5/2026
Expiration Date
5/4/2029
Insurance Exp Date
9/15/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES CITY OFSANTAANA <br /> SANTA ANA BOULEVARD GRADE SEPARATION <br /> MARK 7MOMAS <br /> that deviate from SCRRA standards and manuals. Figure 1 below illustrating the general footprint of <br /> These are anticipated to include requests for the topographic data/aerial imagery to be captured <br /> deviations from 1) minimum temporary horizontal and processed. <br /> clearance requirements, 2) the requirement that a Mark Thomas will map all planimetric feature data <br /> minimum of two columns be provided per track, in three dimensions to generate an Aerial <br /> and 3) bridge skew angle. Topographic Survey Base Map with aerial imagery <br /> 4.3 Design Exceptions —Caltrans background at 1" = 40' scale. Mapped features will <br /> Our team will coordinate with Caltrans regarding generally include roof outlines of buildings and <br /> any existing non-standard design features at the I- other major structures, tops/toes of channels, edge <br /> 5 ramp intersection. It is not expected that this of pavement for all paved surfaces, manholes, <br /> grade separation project will create any new non- drop inlets, parking areas, curbs/gutters, <br /> standard features that would require a Design sidewalks, fences, walls, signs, utility poles, light <br /> Standard Design Document (DSDD) to be poles, above ground utility service facilities, storm <br /> prepared. drain facilities, ditches, streams, trees/tree <br /> outlines, dense brush, bulkheads, and other visible <br /> Task Deliverables: improvements at the surface elevation. Mass <br /> • City Design Memorandum points and break lines will be collected along all <br /> • SCRRA Design Exception Memorandum mapped improvements listed above to create <br /> continuous contours with a 1.0' interval and a <br /> Task 5 Site Survey Digital Terrain Model (DTM). <br /> 5.1 Project Control Assumptions <br /> Mark Thomas will establish horizontal control • Up to eight (8) aerial ground control targets <br /> based on CCS83, Zone VI, and vertical control will will be established <br /> be based on the City of Santa Ana Vertical Datum, • Aerial topographic mapping will not be <br /> to be confirmed with the City prior to control reviewed by Caltrans (no "ABC" submittalfor this project) <br /> establishment. Mark Thomas to set temporary . Field surveys to be conducted under traffic <br /> control points for future design and construction <br /> survey within the project limits. Mark Thomas to control plan, if required. <br /> obtain applicable encroachment permits prior to Task Deliverables <br /> beginning any field survey work. Mark Thomas to 0 Project Control in CSV and PDF formats <br /> also coordinate and verify datum(s) with SCRRA, . Basemap LandNet file in AutoCAD, PDF <br /> where appropriate. formats <br /> 5.2 Aerial Topography . Aerial Topographic Survey Base Map in <br /> Once the project control is established, Mark AutoCAD, PDF and SHP formats <br /> Thomas will establish supplemental horizontal and • Color Digital Orthophotography (JPG or <br /> vertical control necessary for orienting the TIFF format) <br /> photogrammetric survey. Mark Thomas will acquire • Digital Terrain Model (DTM) in CAD format <br /> new color stereo image data covering the above- • Site Photos, Videos and Field Notes <br /> mentioned project area that will be suitable in 5.3 Field Survey <br /> resolution, scale and image quality for developing <br /> key topographic break lines and improvements. Once the geometries are refined utilizing the aerial <br /> Mark Thomas will collect data during the primary mapping, Mark Thomas will perform supplemental <br /> data acquisition mission using conventional flight as-built design surveys within the Project Area, <br /> methods. Aerial imagery will be obtained when the approximate areas as shown below in Figure 1, <br /> ground is not obscured by smog, haze, fog or dust, per direction of the resident engineer. Topographic <br /> and when cloud or cloud shadow coverage will not survey data to be collected using a conventional <br /> appear in any image. Refer to MAGENTA area in Total Station, statictmobile LiDAR and/or GPS and <br />
The URL can be used to link to this page
Your browser does not support the video tag.