Laserfiche WebLink
SCOPE OF SERVICES CITY OFSANTAANA I►J <br /> SANTA ANA BOULEVARD GRADE SEPARATION ■ <br /> HARKTHOHAS <br /> has been included have been assumed based on a conducted on Santa Ana Boulevard to understand <br /> review of existing project information and a heavy vehicle percentages. Fehr& Peers will <br /> preliminary review of the project site. If additional collect traffic signal timing from the City of Santa <br /> studies are identified during the environmental Ana and Caltrans at the study locations. <br /> phase of the project a scope of work and cost will Fehr & Peers will conduct an existing conditions <br /> be submitted for approval by the City prior to their assessment that will evaluate the existing roadway <br /> initiation. system, transit network, and pedestrian/bicycle <br /> For each technical study the following submittals facilities within the study area, along with existing <br /> are assumed (additional submittals would be traffic volumes, and intersection and roadway <br /> considered out of scope): levels of service. <br /> • Draft Technical Study (electronically to the Fehr& Peers will prepare future traffic forecasts for <br /> City and then to Caltrans) the below scenarios utilizing OCTA's latest travel <br /> • Revised Draft Technical Study demand model, Orange County Transportation <br /> (electronically to the City and Caltrans for Analysis Model (OCTAM), which is consistent with <br /> concurrent review) Connect SoCa12024 (Southern California <br /> • Final Technical Study for approval Association of Governments 2024 Regional <br /> (electronically to the City and Caltrans for Transportation Plan and Sustainable Communities <br /> concurrent review and concurrence; Strategy with base year 2019 and future year <br /> assumes no further comments) 2050). A review of OCTAM land use will be <br /> conducted to confirm that land use growth <br /> 6.3.1 Traffic Analysis assumptions are consistent with City expectations <br /> While the reduction in lanes is supported by (Please note that Fehr & Peers recently conducted <br /> preliminary review of average daily traffic, a this model land use review as part of the City's <br /> focused review of peak hour travel is needed to Climate Action Plan and found consistency with <br /> confirm commute congestion is within City and City growth expectations). Two future model runs <br /> OCTA standards. The study will evaluate the (with and without project) will be performed to <br /> Santa Ana Boulevard corridor intersections using understand potential redistribution with the project. <br /> microsimulation software, SimTraffic, which is 1, Opening Year Conditions: project opening <br /> appropriate for closely spaced intersections in year conditions assuming no project. An <br /> congested corridors. Microsimulation is required to ambient growth rate will be developed by <br /> evaluate how queues between intersections build referencing OCTAM and the inclusion of <br /> up over space and time and potentially create relevant pending and approved <br /> gridlock between the closely spaced intersections. development projects anticipated to be in <br /> The following five intersections will be evaluated: operation by opening year. <br /> 1. Santiago Street/Santa Ana Boulevard 2. Future Year Conditions: Future year <br /> 2. Fuller Street/Santa Ana Boulevard conditions to be based on OCTAM <br /> 3. 1-5 SB Off-Ramp/Santa Ana Boulevard forecasts with no project. <br /> 4. Santa Ana Boulevard from Santiago Street 3. Existing plus Construction Conditions: An <br /> to Fuller Street analysis of potential impacts during <br /> 5. Santa Ana Boulevard from Fuller Street to construction of the proposed project <br /> 1-5 SB Off-Ramp assuming that one lane in each direction <br /> will be provided throughout construction. <br /> Fehr & Peers will collect new peak period turning 4. Opening plus Project Conditions: Opening <br /> movement traffic counts (7-9 AM & 4-6 PM) to year traffic volumes with project roadway <br /> prepare the existing conditions baseline condition. configuration. <br /> Traffic counts will include pedestrian and bicycle 5. Future plus Project Conditions: Future year <br /> counts to reflect the active uses in the corridor. A traffic volumes with project roadway <br /> 24-hour vehicle classification count will also be configuration. <br />